Loading…
Loading…
8,545 results • Best match
Construction Of Vyayam Shala Building At Pardi Gp Ghuti Tq Mehkar Dist Buldana
1) Construction Of Vyayam Shala Building At Pardi Gp Ghuti Tq Mehkar Dist Buldana
Balance work of Up-gradation Renovation of Museum Building Construction of New Auditorium including allied external development works at Shaheed Udham Singh Memorial Sunam District Sangrur Punjab
Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres
Construction of Primary Health Center Building at Kistaram,
Construction of Remaining Part of MC Office Building.
Construction of Remaining Part of MC Office Building.
Construction of SHC Building at Raipura Distt. Dausa
Construction of septic Tank in all types of soil with 40 Cm .thick masonry in CM 1:6, 15 Cm thick C.C bed of 1:5:10, M-15 grade C.C flooring & over stone slab covering ,80 mm thick slab ,jointing of slab in CM 1:3. Ralthal, Kharanja, 50 mm thick stone partition walls, 20 mm thick plaster in CM 1:6 finished with neat floating cement, 4 Nos C.I foot rests of approved design ,two No. 450 mm dia each Ferro cement cover with frame, earth work etc. complete as per approved drawing including disposal of surplus earth within a lead of 50 mtr:-
Construction of SHC Building at Kaled Distt. Dausa
Construction of septic Tank in all types of soil with 40 Cm .thick masonry in CM 1:6, 15 Cm thick C.C bed of 1:5:10, M-15 grade C.C flooring & over stone slab covering ,80 mm thick slab ,jointing of slab in CM 1:3. Ralthal, Kharanja, 50 mm thick stone partition walls, 20 mm thick plaster in CM 1:6 finished with neat floating cement, 4 Nos C.I foot rests of approved design ,two No. 450 mm dia each Ferro cement cover with frame, earth work etc. complete as per approved drawing including disposal of surplus earth within a lead of 50 mtr:-