Loading…
Loading…
1,586 results • Best match
Hiring of Consultancy Services - Percentage based - Provn of One Toilet Blocks with allied services for FRI, HQ CIF (R) at Palma under AGE (I) CIF (R); Provn of One Toilet Blocks with allied services for FRI, HQ CIF (R) at Palma under AGE (I) CIF (..
Hiring of Consultancy Services - Percentage based - Provn of One Toilet Blocks with allied services for FRI
Engagement 3rd Party Consultancy Agency / Firms / Individual for monitoring and supervising of civil and electrical works in respect of Reconstruction of Hollong Tourist Lodge
Engagement 3rd Party Consultancy Agency / Firms / Individual for monitoring and supervising of civil & electrical works in respect of Reconstruction of Hollong Tourist Lodge
Refer to Boq
Poviding design and structural consultancy of sub structure and super structure for the Construction of 38.00 mtr Span Steel Motorable Bridge at Ossu Pakhlai., having clear carriageway width of 4.25 Mtr comprising of all components of the bridge i.e. Deep Foundation / Foudation, Abutments, Abutment caps, deck slabs, steel truss through type, return/wing walls, approaches upto the main road (as per site requirement) along with WBM Grade-II, Grade-III, BM and OPGC of approach road and approach slab as directed by Engineer in Charge, of i.e. providing and fixing of appropriate bearings, steel railings, painting of bridge including trench excavation for bridge foundation, dewatering etc. this also includes providing of general arrangement drawings, concept drawings etc. The design of the bridge should be vetted from DIQC/ IIT/ NIT and approved by competent authority. Latest version to be followed in design and soil investigation, geological investigation, sub soil investigation & exploration with all tests and design calculation (complete job) (04 sets of Detailed Project Reports & Drawings in original including BOQ/GAD/concept drawings and all necessary requirements as per directions of Engineer in Charge for Accord of Technical Sanction.)
Preparation of Detailed Project Report (DPR) and Obtaining all Approvals and Clearances for Connectivity of OPGC MGR Line with Indian Railways at Kechobahal or at suitable Location
Preparation of Detailed Project Report (DPR) and Obtaining all Approvals & Clearances for Connectivity of OPGC MGR Line with Indian Railways at Kechobahal/at suitable Location
Selection of an Agency for preparation of DPR for The Atal Expressway to connect Motu in the District of Malkangiri to Tiring in the District of Mayurbhanj
Appointment of Consultants for Preparation of DPR (Pre and Post Tender Activities) for Construction of Minor Bridge at Talegaon Dhamdhere on Vel River Taluka Shirur District Pune