Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹57.5 LAccepted-AOC 8 2 5 RAVULA RESIDENCY MAIN ROAD SRINAGAR COLONY HYDERABAD 500082 TELANGANA | HYDERABAD | TELANGANA | 500082 | ₹57.5 L | L1 | Accepted-AOC The final negotiated amount is Rs. 57,50,000/- excluding GST. Work is being awarded as per recommendation of the committee and approval of competent authority. |
| 2 | Rejected-Technical | - | - | Rejected-Technical Did not meet the minimum technical score criteria. |
| 3 | Rejected-Technical PLOT NO 5841 CHAKEISIHANI NEAR MANGALA MANDIR MANCHESWAR ROAD MANCHESWAR INDUSTRIAL ESTATE KHURDA KHORDHA ODISHA 751010 UDYAM OD 19 0049918 | KHORDHA | ODISHA | 751010 | - | - | Rejected-Technical Did not meet the minimum technical score criteria. |
| Sl No | Description | Qty | Unit | Aarvee Associates Architects Engineers and Consultants Private Limited L1 |
|---|---|---|---|---|
| 1.00Preparation of Detailed Project Report (DPR) and Obtaining all Approvals & Clearances for Connectivity of OPGC MGR Line with Indian Railways at Kechobahal/at suitable Location | ||||
| 1.01 | The charges for Preparation of Detailed Project Report (DPR) and Obtaining all Approvals & Clearances for Connectivity of OPGC MGR Line with Indian Railways at Kechobahal/at suitable Location as per the scope of work, including all manpower, printing, stationery, Travelling, lodging, boarding and all taxes excluding GST. | 1 | LS | 58,50,000 ₹58.5 L |
Tender Value
Refer Docs
EMD Value
₹1.1 L
Closing Date
19 Mar 2026, 5:00 pmClosed
Chief Operating Officer
Odisha Coal and Power Limited, Fourth Floor, Fortune Towers, Chandrasekharpur- 751023, Bhubaneswar, Odisha
Preparation of Detailed Project Report (DPR) and Obtaining all Approvals and Clearances for Connectivity of OPGC MGR Line with Indian Railways at Kechobahal or at suitable Location
2026_OCAPL_126931_1
OCPL/SER-228/2026
Open Tender
Miscellaneous Services
OCPL Manoharpur Sundargarh
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
Odisha Coal and Power Limited
₹1.1 L
Yes
15 Apr 2026
6 Mar 2026
20 Mar 2026
6 Mar 2026
19 Mar 2026
6 Mar 2026
Preparation of Detailed Project Report (DPR) and Obtaining all Approvals & Clearances for Connectivity of OPGC MGR Line with Indian Railways at Kechobahal/at suitable Location
The charges for Preparation of Detailed Project Report (DPR) and Obtaining all Approvals & Clearances for Connectivity of OPGC MGR Line with Indian Railways at Kechobahal/at suitable Location as per the scope of work, including all manpower, printing, stationery, Travelling, lodging, boarding and all taxes excluding GST.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
techsummary_584140.pdf
BOQ Comparative Chart
xlsx
finsummary_584140.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
RFP.pdf
Tender Documents • 1.49 MB
BOQ_584140.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid