Loading…
Loading…
385 results • Latest
S&T work for Interlocking of 01 No. Non Interlocked Engineering L.C.Gate at Rourkela-Kuarmunda (Km. 419/ 13B-14B).
upplying of electrical Gadgets, Desktop Computer, CCTV, Aquaguard, Inverter at Tourist office in Sundergarh District
Civil, Structural, Architectural works of Entire Plant Road and Drain, Workers Rest Room, Parking sheds, Covered Steel Shed,Boundary Wall, Dismantling of existing boundary wall etc. at 1X800 MW Darlipali Super Thermal Power Project, Stage-II
Refilling of cylinder with ultra pure IOLAR Grade:II Hydrogen gas in 47 litres water capacity cylinder which contain 07 Cu.m of gas. Note: i) Delivery period shall be 18 months from PO issue date. (ii) Delivery may be in part as and when required and by the supplier. (iii) Gas purity certificate & explosive certificate for cylinder from NABL certificate lab is must. (iv) Delivery should be Destination at consignee's end
Refilling of cylinder with Ultra pure IOLAR Grade-II Nitrogen gas in 47 liters water capacity cylinder which contains 7 cubic meters of gas in each cylinder. Note: i) Delivery period shall be 18 months from PO issue date. (ii) Delivery may be in part as and when required and by the supplier. (iii) Gas purity certificate & explosive certificate for cylinder from NABL certificate lab is must. (iv) Delivery should be Destination at consignee's end
Supply and Installation of Vacuum pump provided to prevent Contamination of lubricating oil pump with moisture which is removed from the transformer oil machine having facility to ensure that in case of power failure the vacuum pump oil is not sucked into the degassing chamber. Capacity 285 LPM, 3HP, 3PH, 440V AC, D16T. Make: TRIVAC, LAYBOLD OR EQUIVALENT WITH SUITABLE FOR SUMESH PETROLEUM make 1200 LPH Transformer oil filtration plant..