Loading…
Loading…
4,935 results • Best match
Providing Drainage and Coverslab, Pipeline Arrangements at Health Sub Centre Sundresapuram Village in Boganallur Pachayat in Kadayanallur Panchayat Union, Tenkasi District under PUGF 2026 - 2027
Providing Drainage and Coverslab, Pipeline Arrangements at Health Sub Centre Sundresapuram Village in Boganallur Pachayat in Kadayanallur Panchayat Union
Improvement of passage and drainage near Vijay Kirana Store at Gully No.11,Vatsalatai Naik Nagar in Beat No.151 chembur in M/West Ward.
Improvement of passage and drainage near Vijay Kirana Store at Gully No.11,Vatsalatai Naik Nagar in Beat No.151 chembur in M/West Ward.
Teenshade work, Drainage work of trench and Repair of CS-2 and CS-3 wall infront of Mother Milk Bank of JK LON Hospital Kota.
Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. All kinds of soils
Improvement of Pathways and drainage at Plot No.467 Irane D Suza House, Indira Nagar, Kandivali west in Beat no.22 in R/South Ward.
Improvement of Pathways and drainage at Plot No.467 Irane D Suza House, Indira Nagar, Kandivali west in Beat no.22 in R/South Ward.
Rate contract for operation and maintenance of nigam owned/available 2 nos. high power super sucker machine with 3 dump tank including POL, manpower and Labour for opening sewerage line, mainhole blockage and desilting, plugging work in bmc area.
Operation & maintenance of high power super sucker cum jetting machine of 10,000 Ltr. Capacity and two sludge disposed tanker, complete unit with man power, diesel, oil, and de- silting of various sewer line, sewer manholes and storm water drains etc. (Machine shall be provided by nigam)
CONSTRUCTION OF STP MPS AND IPS LAYING OF SEWERAGE NETWORK AND CONSTRUCTION OF MANHOLES AT VILLAGE KAIMRI. CONSTRUCTION OF R/W PUMPING STATION, 3rd WATER WORKS, PROP. BOOSTING STATION, UPGRADATION OF 2nd WATER WORKS AND LAYING THE PIPE LINE
(PART-B: KAIMRI SEWAGE SCHEME):- “Construction of 2.00 MLD STP (SBR technology based), SCADA / PLC controlled including MPS and 5 IPS comprising wet well sump, boundary wall, pump chamber, R/M lines, staff quarters, P/M, DG set, electric transformer and Laying the sewerage network in village. O and M of the schemes during 6 years defect liability cum maintenance period after successful trial run of 3 months and all other contingent thereto as per specifications mentioned in the DNIT