Loading…
Loading…
5,040 results • Best match
Clearing weed,sarkanda,jala,booti from the bed of Talwandi Drain RD 0-34000
Estimate for Flood Risk Mitigation by Laying RCC pipeline in low lying area of Village Lohara out falling at RD 117420 of Chandbhan Diversion Drain.
Water proofing treatment of RCC structures (after making the surface clean, dry & free from all internal voids or honey combs ), with Zycosil /equivalent water proofing Solution (1 litre of Zycosil / equivalent & 20 litres of potable water stirred first & 2 litres of Zycoprime / equivalent added and stirred (total 23 litres)) using two coats till it meets the saturation level and testing as per RILEM or by water drops test in which water drops do not absorb but drops remain or rolls. (CSR Item No. 13.88)
RWD/EE/SRK/01/ 2026-27 Repair of R.C.C Culvert At CH - 7.500 km and CH - 7.800 km of Punisir to Giluwa to Rolahatu to Kora Kuchai Road.
Construction of dry rubble flooring at cross drainage works for relatively less important works. S.O.R. Item No. 16.09
Construction (EPC) Construction of 2 Lane Rail Over Bridge on Kanpur-Etawah Rail Sanction Km. 1116/27-29 in Lieu of Level crossing No 13B (Achhalda - Bidhuna Road) in District Auraiya
Construction on 2Lane ROB. 671.09 Long (Excluding 37.20 Mtr Railway portion) Complete With Pile Foundation, sub structure, Super Structure, R.E Wall, Service Road, RCC Drain, Drainage System With Main Hole, Road Safety, Road Curve along the R.E Walls, Electrification, View Cutter 1.6 Mtr Height, and Other Items as per Morth Specifications.
Interception and Diversion of Nallahs with STP works Project of Amarwara town under SBM 2.0 (second call)
1.Design and build sewage treatment plant of installed capacity 1.5 MLD and all appurtenant structures and allied works. 2.Survey, Investigation, Designing Construction of 1.0 No intermediate pumping Station with Pumps and all necessary electrical and mechanical accessories. 3.Construction of 2 nos. of I&D structure on Existing Nallas and all appurtenant structures and allied works 4.Construction of RCC drain of length 118 mtr. At different locations and all allied work. 5.SEWAGE GRAVATY MAIN: - Providing, Laying, Jointing, Testing, Commissioning & Trial run of Dia. 350 mm to 400 mm of RCC NP3 Class pipe of length 1851 mtr. 6.SEWAGE PUMPING MAIN:- Providing, Laying, Jointing, Testing, Commissioning & Trial run of Dia. 200 mm of DI K-7 pipe of length 660 mtr. 7.Establishment of 1 Nos. of Electrical Substation and Providing and laying of HT Feeder Connection up to Sewerage Treatment Plant/ Pumping Station (For 1 KM)
REPAIR/CLEANING OF SEWAGE SYSTEM TO CERTAIN MD AND OTM ACCN OF ENGR REGT EME BN SIKH REGIMENT FD HOSP INF DIV CAMP IN THE SOUTH ZONE AREA UNDER GE DIPATOLI
S & F ultra plus PE, DWC ( Double Wall corrugated ) pipes confirming IS-16098 Part - 2 : 2013 pertaining structured wall plastics pining system for Non - pressure drainage and sewerage 150 mm bore pipe and fittings with non smooth surface, type B complete all as specified and directed.