Loading…
Loading…
5,053 results • Best match
PROVN OF HARD STANDING FOR B VEH AT JOURIAN GARRISON UNDER GE (S) AKHNOOR.
Providing and laying at or near ground level factory made kerb stone of M-25 (Design mix) grade cement concrete in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5 mm), including making drainage opening wherever required, complete all as specified and as directed.
Construction of drain till Saidapur road ahead of the drain constructed in the east of Mo. Ramnagar Colony Nagara Road Western Side.
cleaning of drainage up to silt at site with disposal of 60 mtr.including waste making diverson etc
Construction work of drain and interlocking road from Idgah culvert to the temple in front of Mo. Billiganj.
leaning of drainage up to silt at site with disposal of 60 mtr.including waste making diverson etc
PROVISION OF 10 x GUARD ROOMS WITH ELEVATED SENTRY POSTS AT Z-GALI UNDER GE 874 EWS
Lump sum price worked out by the contractor for AREA DRAINAGE WORKS carried forward from Pre-Priced Schedule 'A' Part-IV.
Providing Air Conditioner arrangement in Municipal office Thiruthani Municipality.
Providing and fixing casement doors fabricated from un-plasticized polyvinyl chloride (UPVC) sections Profiles: The profiles should be three chamber system which provides high insulation properties with outer frame 60mm x 55mm with an outer wall thickness of 2.4mm. The window unit should be designed with all corner joints mitred and fusion welded. Windows should be steel reinforced with 25 x 24 x 25mm steel reinforcement with a thickness of 1mm to have dimensional stability. The sash should be of 60 x 102mm. The mullion should be of 60 x 74mm. The profiles should have co-extruded seals.Hardware: All the hardware like friction stays, handles should be screwed with self tapping screws. The handles, locks should be designed so that they cannot be released from outside.Glazing: The window system should be glazed with 5mm plain float glass / 6mm bison lam. Installation: The profiles should be cut to length and welded 45 degrees. The window should be designed such that the water drainage does not pass through the reinforcement chamber. The window system should be fixed directly to the plastered brick wall using self expanding nylon plug and driving ms electroplated screws into plug.
Cleaning of storm water drain and cross drain works including cleaning of road side shoulder etc. for the PWD Roads in Diu District.(Pre-monsoon activities) (4th Call)
Cleaning of RCC slab cross drainage along main road upto 6.00 mt span including removing garbage building rubbish, plastic bags, stones, sludge at bed level including provision of safety measure, removing & refixing of slab cover including loading unloading of removed materials / sludge at site with all lead & lift to make free flow of water in proper condition as directed by engineer in charge.