Loading…
Loading…
5,002 results • Best match
Construction of VRB at Km 6.700 of Baniyakhera Dy.
Supplying & Fixing 100 mm dia PVC Drainage Pipe i/c all cost of material, T&P etc for Proper complition of work.
Construction of VRB at Km 3.600 of Baniyakhera Dy.
Supplying & Fixing 100 mm dia PVC Drainage Pipe i/c all cost of material, T&P etc for Proper complition of work.
Provision of Relay Hut at (18 Nos Level crossings) for Gate Signalling at Non Interlocked L-xing gates over Firozpur division (TVU between 10,000 and 20,000) in the jurisdiction of DEN-HQ/FZR as per Type Plan No. HQ/01/02-2017/R-1.
gms Providing and fixing PTMT grating of 18.58 approved quality and colour. 18.58.1 Circular type 11 18.58.1.1 100 mm nominal dia Each 18 33.2 597.6 Total 216309.60 Item- 13 CODE-19 DRAINAGE S No. Item No Description of Item Unit Qty Rate Amount 19.0 DRAINAGE Providing and fixing in position pre-cast 19.19 R.C.C. manhole cover and frame of required shape and approved quality 19.19.4 EHD - 35 1 19.19.4.1 Circular shape 560 mm internal dia Each 36 1882.2 67759.2 Total 67759.20
Construction of the road by RMC from Machhali Mandi to Tiwatighat in Purana Kanpur under ward-13 Zone-4.
Providing and laying at or near ground level factory made kerb stone of M-25 grade cement in position to the required line, level and curvature jointed with cement mortar 1:3 (1cement : 3 coarser sand) including making joints with or without grooves (thickness of joints except ar sharp curve shall not to more than 5mm) including making drainage, opening wherever required complete etc. as per direction of Engg-in-charge (Length of finished kerb shall be measured for payment)
Repairing and Renovation of EVM Warehouse Building at Valsad (C.C. Work and Miscellaneous Work) Ta.& Dist.Valsad
drainage & water supply connection and minor correction to perform experienced in Lab shall be done by contractor at his
Construction of PCC Road From Ambedkar School to Sohan Hotel, at G.P.- Sayal North, Block- Patratu, Dist- Ramgarh.
Dry Rubble Flooring. (Construction of dry rubble flooring at cross drainage works for relatively less important works.) Vide RCD SOR item no. 16.09