Loading…
Loading…
4,987 results • Best match
REPAIR MAINT CLEANING OF SEWAGE LINES MANHOLES COVERED DRAINS SEPTIC TANKS SOAKED WELLS OF 2RA 2RB 3R AT ARC CHARBATIA
S&F in 150mm dia HDPE DWC pipe laid in tranches Class SN 8 structured wall polyethylene piping system (pipe with online /offline coupler and elastomeric sealing ring) with non- smooth External annular corrugated and smooth internal surfaces (double wall) for non- Pressure under ground sewerage application as confirmed to IS16098 (Part-2):2013 complete all as specified and directed. Note : 1. The pipes will be confirming to the IS 16098(Part-2):2013 and shall be marked with BIS.
PROVN OF VEHICLE AND EQPT SHED AT BHARATPUR MIL STN
1 0 2454636.92 Lump sum price worked out by the contractor for "AREA DRAINAGE " as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 4.00 Lump sum price worked out by the contractor for "AREA DRAINAGE " as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 4.00 Lump sum price worked out by the contractor for "AREA DRAINAGE " as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 4.00 1 Lump sum price worked out by the contractor for "AREA DRAINAGE " as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 4.00 Lump sum price worked out by the contractor for "AREA DRAINAGE " as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 4.00 Lump sum price worked out by the contractor for "AREA DRAINAGE " as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 4.00 Lump sum price worked out by the contractor for "AREA DRAINAGE " as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 4.00 Lump sum price worked out by the contractor for "AREA DRAINAGE " as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 4.00 Lump sum price worked out by the contractor for "AREA DRAINAGE " as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 4.00 Lump sum price worked out by the contractor for "AREA DRAINAGE " as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 4.00 Lump sum price worked out by the contractor for "AREA DRAINAGE " as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 4.00 Lump sum price worked out by the contractor for "AREA DRAINAGE " as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 4.00 Lump sum price worked out by the contractor for "AREA DRAINAGE " as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 4.00 Lump sum price worked out by the contractor for "AREA DRAINAGE " as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 4.00 Lump sum price worked out by the contractor for "AREA DRAINAGE " as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 4.00 Lump sum price worked out by the contractor for "AREA DRAINAGE " as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 4.00 Lump sum price worked out by the contractor for "AREA DRAINAGE " as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 4.00 Lump sum price worked out by the contractor for "AREA DRAINAGE " as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 4.00 Lump sum price worked out by the contractor for "AREA DRAINAGE " as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 4.00 Lump sum price worked out by the contractor for "AREA DRAINAGE " as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 4.00 Lump sum price worked out by the contractor for "AREA DRAINAGE " as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 4.00 Lump sum price worked out by the contractor for "AREA DRAINAGE " as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 4.00 Lump sum price worked out by the contractor for "AREA DRAINAGE " as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 4.00 Lump sum price worked out by the contractor for "AREA DRAINAGE " as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 4.00 Lump sum price worked out by the contractor for "AREA DRAINAGE " as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 4.00 Lump sum price worked out by the contractor for "AREA DRAINAGE " as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 4.00 Lump sum price worked out by the contractor for "AREA DRAINAGE " as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 4.00 Lump sum price worked out by the contractor for "AREA DRAINAGE " as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 4.00 Lump sum price worked out by the contractor for "AREA DRAINAGE " as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 4.00 Lump sum price worked out by the contractor for "AREA DRAINAGE " as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 4.00 Lump sum price worked out by the contractor for "AREA DRAINAGE " as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 4.00 Lump sum price worked out by the contractor for "AREA DRAINAGE " as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 4.00 Lump sum price worked out by the contractor for "AREA DRAINAGE " as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 4.00 Lump sum price worked out by the contractor for "AREA DRAINAGE " as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 4.00 Lump sum price worked out by the contractor for "AREA DRAINAGE " as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 4.00 Lump sum price worked out by the contractor for "AREA DRAINAGE " as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 4.00 Lump sum price worked out by the contractor for "AREA DRAINAGE " as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 4.00 Lump sum price worked out by the contractor for "AREA DRAINAGE " as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 4.00 Lump sum price worked out by the contractor for "AREA DRAINAGE " as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 4.00 Lump sum price worked out by the contractor for "AREA DRAINAGE " as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 4.00 Lump sum price worked out by the contractor for "AREA DRAINAGE " as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 4.00 Lump sum price worked out by the contractor for "AREA DRAINAGE " as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 4.00 Lump sum price worked out by the contractor for "AREA DRAINAGE " as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 4.00 Lump sum price worked out by the contractor for "AREA DRAINAGE " as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 4.00 0 Lump sum price worked out by the contractor for "AREA DRAINAGE " as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES 4.00
CONSTRUCTION OF MODEL POLICE STATION BUILDING AT GANGAUR POLICE STATION IN THE DISTRICT OF KHAGARIA WITH ELECTRIFICATION
Providing and fixing factory made uPVC white colour fixed glazed windows/ ventilators comprising of uPVC multi-chambered frame and mullion (where ever required) extruded profiles duly reinforced with 1.60 ± 0.2 mm thick galvanized mild steel section made from roll forming process of required length (shape & size according to uPVC profile), , uPVC extruded glazing beads of appropriate dimension, EPDM gasket, G.I fasteners 100 x 8 mm size for fixing frame to finished wall, plastic packers, plastic caps and necessary stainless steel screws etc. Profile of frame shall be mitred cut and fusion welded at all corners, mullion (if required) shall be also fusion welded including drilling of holes for fixing hardware's and drainage of water etc.
Supplying water tankar As per requirement at Different Places in Bopal ghuma Area in South west Zone (ARC)
7 Engineering Drainage>>Engineering No Drainage Manhole cover - 24
Providing & Supplying Machinery,labour & Wetmix supply For different T P road In Bopal Ghuma Area SWZ (ARC)
7 Engineering Drainage>>Engineering No Drainage Manhole cover - 24
Improvement works by chipping, replastering, Colour Washing and Water Proof Coat over Existing tiled roof of the Assistant Executive Engineer/Manamadurai Office Building.
Cleaning of sewerage water collected in septic tank and clearing sludge, disposing at a suitable place away using hired tank including cost of all cleaning materials, labour, lead, lift cost of all consumables, all T&P'S including removal of cover slab and refixing the same and finishing etc., complete as instructed by Engineer at site