Loading…
Loading…
4,995 results • Best match
S&T arrangements in connection with Provision of (1) 03 lifts for 12m FoB at ATP station. (2)03 lifts for old FoB at AD station.(3)3 lifts for New 12m FoB and 3 lifts for existing FOB at DHNE station.(4)two lifts for New 12m FoB at MALM station. ... existing drainage arrangement ...
Excavation of jointing pit and provision of RCC/FRP joint / Loop chambers of 90 Cms. Inner dia 60 Cms depth and 3mm thickness with two pieces of top cover with hooks each and bottom 40 cover with hole for drainage and cable entry as per Drg. No. RAILTEL/SR/OFC/ 2009/12 and as directed by Engineer to be provided at every joint location and at every Kilometre loop etc., The chamber shall be filled with sand mixed with ariti-stermic power, back filling and ramming of trench after HDPE duct laying, splicing and commissioning.
Civil Maintenance of BSNL Buildings under the jurisdiction of BSNL Civil Division Srinagar SH Day to Day Maintenance and Essential repairs 2026-27
Clearing the chokage of water closet like floor traps gully traps etc includung vertical sewage/ drainage stacks ensuring free flow of sewage all complete including the cost of necessary acids etc. as per the directions of Engineer-in-charge.
Providing New Bore well -2Nos with pumping pipe line pungathur lake to Tiruvallur Government Hospital (Water Supply arrangement for Tiruvallur Government Hospital) in Tiruvallur Muniicpality.
Earth work excavation and depositing on bank with initial lead of 10 m and lift of 2 M in narrow trenches having bed width 1.25m & below for laying of pipes for water supply and sewerage works in the following type of soils as directed by Departmental officers Hard stiff clay, stiff black cotton, hard red earth,shales,murram gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil.SS20B WD-W0653
Providing, Supplying, Lowering, Laying And Jointing of PVC Pipe Line at Umarsar to Guneri Pipeline, Ta.- Lakhpat (Under M & R Programme 2024-25) (3rd Attempt)
Excavation for pipe line trenches for water supply, sewerage line, manhole etc. all
PROVN OF SOLID WASTE MANAGEMENT (SWM) PLANT AT PATIALA UNDER GE (N) PATIALA
Total amount of Sch 'A' Part-VII (Area Drainage Works) lump sum price worked out by the contractor for "Area Drainage Works" as listed in Schedule 'A' Part-VII.
Construction of 06 (Six) nos single lane RCC Bridge at Mouza Bhuta (Ghanashyam Bati) ,Harekrishnapur over Chandreswar Khal and at Mouza -Barasat over Pyrasi Khal and at Mouza Barasat ,Panchgechhya , Gochhati over Gumrai Khal in Block Daspur II
Supplying & laying Double Wall Corrugated (with external annular corrugation and smooth internal walls) High Density Polyethelene Pipes conforming to IS 16098 (Part-I):2013 having Stiffness Class of SN 8 with Ring Stiffness not less than 8.00 KN/Sqm. and Impact Resistance TIR value not more than 10% including necessary jointing materials for onpressure underground Drainage, Sewerage & Cross drainage application. (i) 150mm internal dia.