Loading…
Loading…
4,772 results • Best match
Improvement Upgradation of road from Kullian to R.S. Pura Under SASCI Restoration
Providing and laying at or near ground level factory made kerb stone ofM-25 grade cement in position to the required line, level and curvaturejointed with cement mortar 1:3 (1 cement: 3 coarse sand) includingmaking joints with or without grooves (thickness of the joints except at sharp curve shall not to be more than 5mm) including making drainage opening wherever required complete etc. as per direction of Engineer-incharge(length of finished kerb edging shall be measured for payment).(Precast C.C. kerb stone shall be approved by Engineer-in-charge).
CONSTRUCTION OF TECH BUILDINGS ALONGWITH ALLIED INFRASTRUCTURE AT SHESHARTHANG UNDER GE I P NO 2 LEH
Total amount of Sch ‘A’ Part - V (AREA DRAINAGE)
Yard Improvement in DLI-BTI section in the Jurisdiction of DEN-IV/DLI. CTR-45.05 Tkm in loop lines (By Contractor's SQRS-28.90 Tkm & Manual-16.15 Tkm), TTR-54 sets, Trap-34 sets & SEJ renewal-83 sets
Set Manual deep screening of Plain track/ turnouts under traffic as per procedure prescribed in IRPWM, June 2020 or latest, in other than PSC sleepers of any density and throwing away screened muck arising out of screening on toe of bank or on cess, if low or on spoil banks above top of cutting (including throwing and leveling, if required beyond minimum 5m from the edge of cutting which are up to 3m deep or alternatively carting it up to 50m for disposing it off beyond cutting or platforms) as per direction of Engineer in-charge, including cutting cess for effective drainage on both sides, one round of kutcha packing with screened ballast and further attending to track parameter to make track fit for 20 kmph speed complete in all respect. Note : Payment shall be made for length along main line only for turnouts.
CONSTRUCTION OF EXAMINATION HALL FOR TRAINEES AT NO 2 TRAINING BATTALION OF AOC CENTRE UNDER GE(SOUTH) SECUNDERABAD.
Lump sum price worked out by the Contractor for “ AREA DRAINAGE” as listed in Schedule ‘A’ Part - VII representing ______ % _________________ percent Above / Below the lump sum price of ₹ 559820.01 inserted by the MES in Schedule ‘A’ Part - VII
SPECIAL REPAIR TO MANGAL PANDEY ROAD FROM STN CHOWK TO SADAR FLY OVER UNDER AGE B/R-II GE (WEST) LUCKNOW.
M& L for providing and laying at or near ground level factory made kerb stone of M-25 grade cement concrete in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5 mm), including necessary excavation making drainage opening wherever required complete all as specified and directed.
Various Face-lifting Works at Dam Site of BHEP
Designing, fabricating, testing, installing and fixing in position Curtain Wall with Aluminium Composite Panel Cladding, with open grooves for linear as well as curvilinear portions of the building, for all heights and all levels etc. including: a) Structural analysis & design and preparation of shop drawings for pressure equalization or rain screen principle as required, proper drainage of water to make it watertight including checking of all the structural and functional design. b) Providing, fabricating and supplying and fixing panels of aluminium composite panel cladding in pan shape in metallic colour of approved shades made out of 4mm thick aluminium composite panel material consisting of 3mm thick FR grade mineral core sandwiched between two Aluminium sheets (each 0.5mm thick). The aluminium composite panel cladding sheet shall be coil coated, with Kynar 500 based PVDF / Lumiflon based fluoropolymer resin coating of approved colour and shade on face # 1 and polymer (Service) coating on face # 2 as specified using stainless steel screws, nuts, bolts, washers, cleats, weather silicone sealant, backer rods etc. c) The fastening brackets of Aluminium alloy 6005 T5 / MS with Hot Dip Galvanized with serrations and serrated washers to arrest the wind load movement, fasteners, SS 316 Pins and anchor bolts of approved make in SS 316, Nylon separators to prevent bimetallic contacts all complete required to perform as per specification and drawing The item includes cost of all material &labour component, the cost of all mock ups at site, cost of all samples of the individual components for testing in an approved laboratory, field tests on the assembled working curtain wall with aluminium composite panel cladding, cleaning and protection of the curtain wall with aluminium composite panel cladding till the handing over of the building for occupation. Base frame work for ACP cladding is payable under the relevant aluminium items The Contractor shall provide curtain wall with aluminium composite panel cladding, having all the performance characteristics all complete , as per the Architectural drawings, as per item description, as specified, as per the approved shop drawings and as directed by the Engineer-in-Charge. However, for the purpose of payment, only the actual area on the external face of the curtain wall with Aluminum Composite Panel Cladding (including width of groove) shall be measured in sqm. up to two decimal places.