Loading…
Loading…
4,887 results • Best match
RE-INVITE TENDER DOCUMENT FOR THE CONSTRUCTION OF PHASE – 2 OF THE SECURED ENGINEERED MUNICIPAL SOLID WASTE LANDFILL SITEFOR DISPOSAL OF PROCESSED MUNICIPAL SOLID WASTES OF AHMEDABAD MUNICIPAL CORPORATION
4 Construction of Drainage Layer at the Bottom of phase
Sundarpur ke ganesh dham colony me shri janardan singh ke awas se nale me stith intercenter tak siwar line nirman karya
Providing and fixing of 110 mm dia PVC Pipe for drainage ISI Mark As per DSR Code 12.41.2
Improvement of chooragaad to sutol kanol Motor Road under Nanda Devi Rajjat Yatra
Excavation for Structures :Excavation in foundation for cross drainage structures, Retaining walls, brest walls, brest walls, breast walls and other similar structure in all types of soils and rocks as met at site with all leads, lift and disposal of surplus earth as directed by Engineer-in-charge aslo including supply of all materials, labour, T&P etc. required for proper completion of work.
Augmentation work
Providing, Laying and Fixing of oil drainage GI pipes Medium duty 50mm Dia conforming to IS 1239:1990 with latest amendments complete with GI fittings (excluding the cost of fittings) with cuts and th...
Construction of Rahtadah to Motimpur Road Length 2.30 K.M. including Bridges & culverts At Distt.- DURG (C.G.) .
Granular Sub-base as per Table:- 400-1 Construction of granular sub-base by providing graded Material ,carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface watering, rolling and compacting with vibratory power roller at OMC to achieve the desired density, complete as per clause 401 A)Plant mix method (with Mechanically crushed stone only) (b) For Sub-base cum drainage layer or upper sub-base with (i) Grading-V Material
Construction of Pauha To Khapri Road Length 2.20 K.M including Bridges & culverts at Distt.- DURG (C.G.)
Granular Sub-base as per Table:- 400-1 Construction of granular sub-base by providing graded Material ,carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface watering, rolling and compacting with vibratory power roller at OMC to achieve the desired density, complete as per clause 401 A)Plant mix method (with Mechanically crushed stone only) (b) For Sub-base cum drainage layer or upper sub-base with (i) Grading-V Material