Loading…
Loading…
4,875 results • Best match
MP-LADS- 2025-26 of Sri.Francis George MP Ward-08,Bharananganam GP-Construction of Bus shelter (4.5 M x 1.5 M) at Bharananganam Pilligrim center on Erattupetta to Pala road side in Bharananganam GP, Ward- 08, Kottayam District
OD209714/2025-2026 (Structural Glazing and Aluminium Composite Panel 25.7.) Designing, fabricating, testing, installing and fixing in position Curtain Wall with Aluminium Composite Panel Cladding, with open grooves for linear as well as curvilinear portions of the building, for all heights and all levels etc. including: a) Structural analysis & design and preparation of shop drawings for pressure equalisation or rain screen principle as required, proper drainage of water to make it watertight including checking of all the structural and functional design. b) Providing, fabricating and supplying and fixing panels of aluminium composite panel cladding in pan shape in metalic colour of approved shades made out of 4mm thick aluminium composite panel material consisting of 3mm thick FR grade mineral core sandwiched between two Alumini um sheets (each0.5mm thick). The aluminium composite panel cladding sheet shall be coil coated, with Kynar 500based PVDF / Lumiflon based fluoropolymer resin coating of approved colour and shade on face # 1 and polymer (Service) coating on face #2 as specified using stainless steel screws, nuts, bolts, washers, cleats, weather silicone sealant, backer rods etc. c) The fastening brackets of Aluminium alloy 6005 T5/MS with Hot Dip Galvanised with serrations and serrated washers to arrest the wind load movement, fasteners, SS 316 Pins and anchor bolts of approved make in SS 316, Nylon separators to prevent bi-metallic contacts all complete required to perform as per specification and drawing The item includes cost of all material & labour component, the cost of all mock ups at site, cost of all samples of the individual components for testing in an approved laboratory, field tests on the assembled working curtain wall with aluminium composite panel cladding, cleaning and protection of the curtain wall with aluminium composite panel cladding till the handing over of the building for occupation. Base frame work for ACP cladding is payable under the relevant aluminium item.s The Contractor shall provide curtain wall with aluminium composite panel cladding, having all the performance characteristics all complete, as per the Architectural drawings, as per item description, as specified, as per the approved shop drawings and as directed by the Engineer-in-Charge. However, for the purpose of payment, only the actual area on the external face of the curtain wall with Aluminum Composite Panel Cladding (including width of groove) shall be measured in sqm. up to two decimal places.
PROVN OF DEFICIENT LIVING ACCN FOR OFFICERS AND AIRMEN AT 47 SU SPL WORK UNDER GE AF CHILODA
Lump sum price worked out for AREA DRAINAGE as listed in Sch 'A’ Part VI
Completion of Incomplete Dwakra Building in Palangi (V) of Undrajavaram Mandal,Est Cost Rs:-12.00 Lakhs
Providing and fixing factory made uPVC white colour sliding glazed window upto 1.50 m in height dimension comprising of uPVC multi-chamberedframe with in-built roller track and sash extruded profiles duly reinforcedwith 1.60 ± 0.2 mm thick galvanized mild steel section made from rollforming process of required length (shape & size according to uPVCprofile), appropriate dimension of uPVC extruded glazing beads anduPVC extruded interlocks, EPDM gasket, wool pile, zinc alloy (whitepowder coated) touch locks with hook, zinc alloy body with single nylonrollers (weight bearing capacity to be 40 kg), G.I fasteners 100 x 8 mmsize for fixing frame to finished wall and necessary stainless steel screwsetc. Profile of frame & sash shall be mitred cut and fusion welded at allcorners, including drilling of holes for fixing hardware's and drainage ofwater etc. After fixing frame the gap between frame and adjacent finishedwall shall be filled with weather proof silicon sealent over backer rod ofrequired size and of approved quality, all complete as per approved drawing& direction of Engineer-in-Charge.Three track three panels sliding window with fly proof SSwire mesh (Two nos. glazed & one no.wire mesh panels) made of (small series) frame 92 x 44mm & sash 32 x 60 mm both having wall thickness of 1.9 ± 0.2 mm and single glazing bead of appropriated imension (Area of window up to 1.75 sqm) MAT -05448Ground Floor
GENERAL Budget W o r k 2 0 1 7 2 0 1 8 Improvements toKaruvatta Thatta Mamoodu road working chainage from ch 0 00 3 578 Balance work in Karuvatta Thatta Mammoodu road General Civil Work
4.1.B.1:Construction of granular sub-base by providing graded material, spreading in uniform layers with a motor grader on a prepared surface, mixing by mix in-place method with rotavator at OMC, and compacting with a vibratory roller to achieve the desired density, complete as per clause 401. Grading-V - For sub-base cum drainage layer - Mix in Place Method
GENERAL Budget Work 2025 2026 Improvements of Village Roads in Chengannur LAC Thundiyilpadi Komankulangara Salem church Pazhoor mukku Salem school road in ward 3 Venmoney GP General Civil Work
4.1.B.1:Construction of granular sub-base by providing graded material, spreading in uniform layers with a motor grader on a prepared surface, mixing by mix in-place method with rotavator at OMC, and compacting with a vibratory roller to achieve the desired density, complete as per clause 401. Grading-V - For sub-base cum drainage layer - Mix in Place Method
(i) Impt. of road with Earth Filling and Sand Gravelling from Bahbari Gadhuli Bazar Ramesh Sutradhar House Manas PWD Main Road to Saikhang House at Mayangpara, Salbari, Baksa under SOPD (BTC) for the year 2026-27 (ii) Impt. of road with earth filling
Drainage spouts complete as per drawing and technical specification Clauses 1209