Loading…
Loading…
4,858 results • Best match
CAMC of split type, VRF ducted split unit, cassette type, Tower type, window type & Ductable AC package unit of different capacity in Lumding Division for three years.
Supply, laying, fitting and fixing of 25 mm dia UPVC drain pipe complete with all 9 required accessories such as bends, elbows, tees, flanges, tappings, wall sleeves, hangers, clamps, supports, anchors and jointing materials, including cutting, threading/jointing, fixing on wall/ceiling with suitable supports and making proper connections complete for drainage application as directed by the Engineer-in-Charge.
Road construction work from Kadaiyahat to Godiyamehar in Baran district.
Drainage spouts complete as per drawing and MoRTH specifications Clause 2705
Road construction work from Khalakpura village to Khajuri
Drainage spouts complete as per drawing and MoRTH specifications Clause 2705
Road construction work from Pali to Nawabpura
Drainage spouts complete as per drawing and MoRTH specifications Clause 2705
Family Court Building (Old Civil Court) at Anand. (Supplying, Erecting, Testing & Commissioning the Passenger Lift & Civil Work)
and plumbing like drainage line, rain water line &
Construction of ORS living accommodation at Anini forward area of 58th Bn ITBP
Providing and fixing factory made uPVC glazed/wire mesh windows/doors comprising of lead free uPVC multi-chambered frame, sash and mullion/coupler (where ever required) extruded profiles having minimum wall thickness of 1.70 mm for Series R1 and R2 profiles and 2.10 mm for Series R3 and R4 profiles conforming to EN: 12608 in any shape, colour and design duly reinforced with galvanized mild steel section made of required shape & size as per CPWD Specification, uPVC extruded glazing beads, interlocks and Inline sash adaptor (where ever required) of appropriate dimension, EPDM gasket, hardware, SS 304 grade fasteners of minimum 8 mm dia with countersunk head, comprising of matching polyamide PA6 grade sleeve for fixing frame to finished wall as per IS 1367 : Part 1 to 14, plastic packers, plastic caps and necessary stainless steel screws etc. Profile of frame, sash & mullion (if required) shall be mitred cut and fusion welded/mechanically jointed duly sealed at all corners, including drilling of holes for fixing hardware and drainage of water etc. After fixing frame the gap between frame and adjacent finished wall shall be filled with weather proof silicon sealant over backer rod of approved size and quality, all complete as per approved drawing conforming to CPWD specification & direction of Engineer-in-Charge. Section of steel reinforcement and cross sections of uPVC profiles to be as per design approved by Engineer-in-Charge. Wire mesh / Glazing of plain/ toughened/ laminated/ double glass unit with / without high performance coatings as per design requirements and conforming to IS: 3548 & IS: 16231 shall be paid separately. Note:- Structural design proof checked from a Government Engineering Institute, to be provided by the manufacturer for : (i) Sites with basic wind speed > 45 m/sec as per IS 875 – Part 3 (ii) Sites with structure height more than 20m for all wind speeds Three track three panels sliding window with two glazed & one wire mesh panels with Aluminium channel for roller track, wool pile, nylon rollers with SS 304 body. Using R2 series with frame (70mm & above) x (40mm & above) & both glazed and fly screen sash (25mm & above) x (50mm & above) with zinc alloy (zamak) powder coated touch locks with hook. (Height upto 1.2 metre).