Loading…
Loading…
4,957 results • Best match
Renovation of 3rd floor of Burn Unit for skin bank, research room, laboratory, etc and provision of UPVC window/door for closing of Balcony at AIIMS, Bhubaneswar (2nd call).
... jointed duly sealed at all corners, including drilling of holes for fixing hardware and drainage of water etc. After fixing frame the gap between frame and adjacent finished wall shall be filled ...
REPAIR TO JOINERY, KITCHEN CABINETS , DOORS, WINDOWS AND RELATED WKS UNDER AGE BR IV OF GE (SOUTH) MEERUT
... and fusion welded at all corners, including drilling of holes for fixing hardware and drainage of water etc., making arrangement for fixing of hardware.EPDM gasket, 1.2+ -0.2mm thick galvanised ...
Repair and Maintenance of RIPSAT Boys Hostel, 79 Tilla, Agartala during the year 2026-27/ SH Polyethylene Water storage tank, Brickwork, Plastering, Tiles, Sanitary works etc (2nd call).
... shop drawings for pressure equalisation or rain screen principle as required, proper drainage of water to make it watertight including checking of all the structural and functional design. ...
Const. of Helipad, Barricading and Other Work for V.V.I.P. and V.I.P. Programme Under Sub. Dn. Majhauli, Distt. Sidhi PWD Building SOR w.e.f 01-01-24 and Road SOR w.e.f 11-04-25
... and fusion welded at all corners, including drilling of holes for fixing hardware's and drainage of water etc. After fixing frame the gap between frame and adjacent finished wall shall be filled ...
Const. of Helipad, Barricading and Other Work for V.V.I.P. and V.I.P. Programme Under Sub. Dn. Sidhi, Distt. Sidhi PWD Building SOR w.e.f 01-01-24 and Road SOR w.e.f 11-04-25
... and fusion welded at all corners, including drilling of holes for fixing hardware's and drainage of water etc. After fixing frame the gap between frame and adjacent finished wall shall be filled ...
Const. of Helipad, Barricading and Other Work for V.V.I.P. and V.I.P. Programme Under Sub. Dn. Churhat, Distt. Sidhi PWD Building SOR w.e.f 01-01-24 and Road SOR w.e.f 11-04-25
... and fusion welded at all corners, including drilling of holes for fixing hardware's and drainage of water etc. After fixing frame the gap between frame and adjacent finished wall shall be filled ...