Loading…
Loading…
30,029 results • Best match
C/O RCC Manhole Chamber 3 Nos and Laying Jointing and Testing of DI pipe 150mm dia 50 Rmt at lower Paddal Near House of SK Kashyap and C/O RCC Platform and C/O PCC Anchor Block
Excavation in foundation and trenches in earth work upto all depth in all kinds of soil such as pick work jumper work, blasting work,chiselling of soft /hard rock where blasting is prohibited in all leads and lifts and including trimming of sides levelling of bed to correct grade stacking the excavated soil in 15 cm. layers when required into plinth sides of foundation including consolidating each deposited layer by ramming and watering and then disposing oof all surpius excavated soil as directed in all leads and lifts and soring/strutting timbering and dewatering where ever required to the entire satisfaction of the Engineer-in-Charge.
C/O RCC Manhole chamber 3 Nos and Laying Jointing and Testing of DI pipe 150mm dia 50 Rmt and C/O RCC Pillar 2 Nos and C/O RCC Platform 1 No at Khaliyar near Lugad Bhatti
Excavation in foundation and trenches in earth work upto all depth in all kinds of soil such as pick work jumper work, blasting work,chiselling of soft /hard rock where blasting is prohibited in all leads and lifts and including trimming of sides levelling of bed to correct grade stacking the excavated soil in 15 cm. layers when required into plinth sides of foundation including consolidating each deposited layer by ramming and watering and then disposing oof all surpius excavated soil as directed in all leads and lifts and soring/strutting timbering and dewatering where ever required to the entire satisfaction of the Engineer-in-Charge.
C/O RCC Manhole chamber 7 Nos and Laying Jointing and Testing of DI pipe 150mm dia 100 Rmt at Khaliyar near House of Guddi Devi
Excavation in foundation and trenches in earth work upto all depth in all kinds of soil such as pick work jumper work, blasting work,chiselling of soft /hard rock where blasting is prohibited in all leads and lifts and including trimming of sides levelling of bed to correct grade stacking the excavated soil in 15 cm. layers when required into plinth sides of foundation including consolidating each deposited layer by ramming and watering and then disposing oof all surpius excavated soil as directed in all leads and lifts and soring/strutting timbering and dewatering where ever required to the entire satisfaction of the Engineer-in-Charge.
C/O RCC Manhole chamber 3 Nos and Laying Jointing and Testing of DI pipe 150mm dia 60 Rmt at Do amb
Excavation in foundation and trenches in earth work upto all depth in all kinds of soil such as pick work jumper work, blasting work,chiselling of soft /hard rock where blasting is prohibited in all leads and lifts and including trimming of sides levelling of bed to correct grade stacking the excavated soil in 15 cm. layers when required into plinth sides of foundation including consolidating each deposited layer by ramming and watering and then disposing oof all surpius excavated soil as directed in all leads and lifts and soring/strutting timbering and dewatering where ever required to the entire satisfaction of the Engineer-in-Charge.
Cleaning work of PBM and associated group of hospitals/Research Centres, outdoor areas, drainage and sewerage system as well as disposal of garbage at the dumping station(with machine, manpower and items) on Job Basis for 420 Work Points
DEVELOPMENT OF UTTARAN AREA SEWERAGE SYSTEM AT 20 GOLAP SASTRI LANE IN WARD NO-50
SECTION(B) - SANITARY AND DRAINAGE WORKS.(B)-(II) SOIL PIPE AND FITTINGS.(a) Original Works.(16.)Supplying, fitting and fixing with cement jointing (3:1) salt glazed stoneware pipe including excavation of earth upto 1.50 metre depth in all sorts of soil both mixed or unmixed and refilling (but excluding concreting at bottom and sides).(ii) 225 mm