Loading…
Loading…
30,191 results • Best match
SH CO sound proof room for air blower pump at STP Manali
as per BOQ
SH Laying Jointing and Testing of D.I. Pipe and construction of Manhole Chamber
Excavation in foundation and trenches (for pipes and pits) up to all depths and in all clasification of earth work such as pick Work, jumper work, chiselling or Wedging out of soft and hard rock where the blasting work is prohibited saturated soil including pumping or bailing out water in all lifts including trimming and dressng of sides, levelling of beds to correct grade including shoring strutting planking timbering and dewatering where ever required. Stacking usable and unusable matrial/soil separetaly and after laying, jointing and testing of pipes (for pipes, pipe duct, chambers, x-signs etc.) returning the usable soil in 15 cm layers by ramming and wetering and then desposing of all surlus excavated soil/un usable material as directed wirhin all leads/lifts includng restoration of unmetalled surfaces to its original conditionn and includng cost of divresion for traffic, night signal boards, fixing custion boards, crossing over tranches for access to houses, fencing etc. complete in all respect as per the direction and to be entire of Engineer-in-Charge within all leads and lifts. (Pick work & jumper work)
SH R M Survey investigation for prepration of Details Project Report
Preparation of Detailed Project Report (DPR) forProviding Sewerage Scheme to Chirgoan Bazar and its Surrounding Area in GP Sundha Bonha in Tehsil Chirgoan, Distt. Shimla Himachal Pradesh with using advanced technology, Marking of Proposal, Preparation of L-section and X-section as required, for site condition in complete form. The detailed project report should contain complete proposal with detailed design of Sewerage System along with all components and latest authentic references. DPR should contain the drawing, details of measurements and abstract of cost of all STP and sewage network components, including Inlet Chamber, Screen Chamber, Grit Channel, Distribution Box, secondary treatment reactor, Sludge dewatering and drying systems in the shape of planted and unplanted SDBs, Constructed Wetland (Rootzone System) or other suitable technology, Multi Media Filter, Chlorine Contact Tank, Fencing Panels around the S.T.P Yard, Steel Gate, Interconnecting Path, Railing and Access Ladder, Plant Building/Chowkidhar Room, manhole chamber, inspection chamber, etc. Drawing shall be prepared with AUTOCADD and nicely winded 04 (Four) copies of set of drawings shall be in hard & in soft format; complete in all respect as per directions of Engineer in Charge. The technology adopted in the DPR should conform to the CPHEEO manual parameter and should be capable to treat the desired effluent standards of pollution board authorities, like CPCB and HPPCB..
SH R R Additional of nanozymes in areation Tank
as per BOQ