Loading…
Loading…
30,191 results • Best match
Repair and rewinding of sewerage submerisble pump sets at sewerage sump Shastri Nagar along with other allied works Manimajra under the charge of SDE MCPH Divsion No 20 Chandigarh Ch to Revenue Head Minor Works
eProcurement System Chandigarh UT Administration Created By: Parvinder Pal Singh Created Date/Time: 06-Mar-2026 11:48 AM Tender Title: Repair and rewinding of sewerage submerisble pump sets at sewerage sump Shastri Nagar along with other allied works Manimajra under the charge of SDE MCPH Divsion No 20 Chandigarh Ch to Revenue Head Minor Works Tender ID: 2026_MCC_90512_2
SH Construction of 20KLD co treatment of septage and fecal sludge in sewerage treatment facilities at STP Sharabai Bhuntar in Distt Kullu H.P
Providing laying & Jointing of DI pipes iconfirming to IS 8329-2000 in standred lengths of 4 mtrs. To 6 mtrs. 100 mm dia Class- K-7 including testing and providing tyton (push on joints) to ductile iron and fittings with tyton rubber ring (SBR quality) conforming to IS 12820-1989 , including testing of joints.( Drainage from ABR to Sludge sump ). complete within all lead and lift as per direction and satisfaction of the Engineer in charge.
SH RR Additional of nanozymes and nutrition powder in areation Tank
as per BOQ
Laying, Jointing and testing of DI pipe of 150 mm dia and C/O RCC Manhole Chamber Near Forties Hospital to existing line TVS main Road Kangra
Laying, jointing and testing of DI K-7 pipe 150mm dia and C/O RCC Manhole chamber Brahaman Sabha to Wet Well).
Excavation in foundation ( trenches for pipes and M/holes) upto all depths in all classification of earth work such as pick work, jumper work, blasting soft/hard rock or chieselling soft/hard rock where blasting is prohibited, cutting of matelled bitumenous roads / pucca pavements i/c saturated soil/ bailing or pumping out water in all lifts including trimming and dressing of sides,levelling of beds to correct grade including shoring,strutting, planking, timbering and dewatering wherever required, stacking the useable and un-usable material/soil separately and after laying, jointing and testing of pipes returning the useable soil to trenches in 15cm (fifteen centimeters)layers including consolidating of each deposited layer by ramming and watering and then disposing of all surplus excavated soil,un-usable materials as directed within all leads and lifts including restoration of un-metalled surfaces to its original condition and also including cost of diversion of traffic,night signals,fixing caution boards,crossing over trenches for access to houses,fencing etc.complete in all respects within all leads and lifts as per the directions of Engineer-in-charge.