| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹52.4 LAccepted-Finance R O RAMSHILLA P O AKHARA BAZAR DISTT KULLU | SHIMLA | HIMACHAL PRADESH | 172001 | ₹52.4 L | L1 | Accepted-Finance Eligible |
| 2 | L2₹54.0 L+₹1.5 L (2.92%)Rejected-Finance NOT AVAILABLE | NA | NA | 121004 | ₹54.0 L+₹1.5 L (2.92%) | L2 | Rejected-Finance In Eligible |
| 3 | L3₹54.9 L+₹2.5 L (4.68%)Rejected-Finance | ₹54.9 L+₹2.5 L (4.68%) | L3 | Rejected-Finance In Eligible |
| 4 | L4₹59.3 L+₹6.9 L (13.1%)Rejected-Finance M S ASHAPURI INFRACON PVT LTD VILLAGE AND PO HURLA TEHSIL BHUNTER DISTT KULLU H P | ₹59.3 L+₹6.9 L (13.1%) | L4 | Rejected-Finance In Eligible |
| Sl No | Description | Qty | Unit | Yash Pal L4 | Amit sood contractor L1 | MNBN Enterprises L2 | Chitar Singh L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in cutting by manual/ mechanical means up to lift of 1.5 meter and disposal of earth up to 20 meters complete work with in all leads and lifts as per the entire satisfaction & direction of the Engineer-in-charge | 35.52 | Cum | 250 ₹8,880 | 195 ₹6,926.4 Lowest | 279 ₹9,910.08 | 250 ₹8,880 |
| 2.00 | Excavation in foundations, trenches etc.in all kind of soil in all leads and lifts such as pick work, jumper work in saturated/unsaturated soil including bailing out water, blasting work in hard/ soft rock or chiseling in hard/soft rock where blasting is prohibited in all lifts stacking the excavated earth not more than 3 mtrs clear from the edge of excavation and then returning the stacked soil in 15 cm layers when required into plinths sides of each deposited layer by ramming and watering and then disposing of all surplus excavated earth foundations etc., consolidating as directed within all leads and lifts and handing over the useable materials available from excavation to department free of cost complete work with in all leads and lifts as per the entire satisfaction & direction of the Engineer-in-charge | 92.37 | Cum | 380 ₹35,100.6 | 253 ₹23,369.61 Lowest | 360 ₹33,253.2 | 350 ₹32,329.5 |
| 3.00 | Stone Soling 0.23 M for approach ramp | 6.81 | Cum | 1,800 ₹12,258 | 530 ₹3,609.3 Lowest | 1,699 ₹11,570.19 | 1,500 ₹10,215 |
| 4.00 | P/L C. C. 1:3:6(1 cement : 3 sand : 6 graded stone aggregate 40 mm nominal size )and curing complete excluding cost of form work as per direction of the Engineer-in-Charge with in all leads and lifts. in foundation and plinth | 25.19 | Cum | 6,500 ₹1,63,735 | 5,600 ₹1,41,064 Lowest | 6,600 ₹1,66,254 | 8,000 ₹2,01,520 |
| 5.00Providing and laying cement concrete work 1:1 ½ :3 (1 Cement :1 ½ Sand : 3 graded stone aggregate 20mm nominal size)and curing complete excluding cost of form work and reinforcement for reinforced cement concrete work in | |||||||
| 5.01 | i) In foundations ,footings bases of columns and the like and mass concrete work complete in all respects | 23.64 | Cum | 8,200 ₹1,93,848 | 7,300 ₹1,72,572 | 7,000 ₹1,65,480 Lowest | 9,000 ₹2,12,760 |
| 5.02 | ii) In Walls any thickness (but not less than 0.10meter thickness including attached pilasters, buttresses plinth and string courses etc. from top of foundation(level) upto floor two level including all leads and lifts etc. complete in all respects | 37.35 | Cum | 8,700 ₹3,24,945 | 7,350 ₹2,74,522.5 | 7,200 ₹2,68,920 Lowest | 9,000 ₹3,36,150 |
| 6.00 | Providing, and installation of screen bars in SS304 ( 1350*10*40 )mm complete work with in all leads and lifts as per the entire satisfaction & direction of the Engineer-in-charge | 73.44 | Kg | 220 ₹16,156.8 | 233 ₹17,111.52 | 636 ₹46,707.84 | 135 ₹9,914.4 Lowest |
| 7.00Providing form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm so as to give a fair finish I/c centring , shuttering , strutting and proping etc.with wooden battens and ballies, height of propping and centring below supporting floor to ceiling not exceeding 4mtrs. and removal of the same for insitu- reinforced concrete & plain concrete work in:- | |||||||
| 7.01 | a) Vertical surfaces such as walls(any thickness )partition and the like including attached pillasters, buttresses plinth and string courses and like including all leads and lifts etc. complete in all respects. | 275.13 | Sqm | 400 ₹1,10,052 | 280 ₹77,036.4 Lowest | 399 ₹1,09,776.87 | 290 ₹79,787.7 |
Tender Value
₹61.5 L
EMD Value
₹1.2 L
Closing Date
5 Mar 2026, 5:00 pmClosed
Executive Engineer
Jal Shakti Division Kullu
SH Construction of 20KLD co treatment of septage and fecal sludge in sewerage treatment facilities at STP Sharabai Bhuntar in Distt Kullu H.P
2026_HPIPH_129304_1
12477-527 STP Sarabai SBM
Open Tender
Civil Works
Item Rate
60 days
Sharabai
Please refer Tender documents.
6 documents required · 6 mandatory
₹2,000
Executive Engineer
₹1.2 L
16 Mar 2026
23 Feb 2026
6 Mar 2026
23 Feb 2026
5 Mar 2026
23 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in cutting by manual/ mechanical means up to lift of 1.5 meter and disposal of earth up to 20 meters complete work with in all leads and lifts as per the entire satisfaction & direction of the Engineer-in-charge | 35.52 | Cum | - | - |
| 2 | Excavation in foundations, trenches etc.in all kind of soil in all leads and lifts such as pick work, jumper work in saturated/unsaturated soil including bailing out water, blasting work in hard/ soft rock or chiseling in hard/soft rock where blasting is prohibited in all lifts stacking the excavated earth not more than 3 mtrs clear from the edge of excavation and then returning the stacked soil in 15 cm layers when required into plinths sides of each deposited layer by ramming and watering and then disposing of all surplus excavated earth foundations etc., consolidating as directed within all leads and lifts and handing over the useable materials available from excavation to department free of cost complete work with in all leads and lifts as per the entire satisfaction & direction of the Engineer-in-charge | 92.37 | Cum | - | - |
| 3 | Stone Soling 0.23 M for approach ramp | 6.81 | Cum | - | - |
| 4 | P/L C. C. 1:3:6(1 cement : 3 sand : 6 graded stone aggregate 40 mm nominal size )and curing complete excluding cost of form work as per direction of the Engineer-in-Charge with in all leads and lifts. in foundation and plinth | 25.19 | Cum | - | - |
| 5Providing and laying cement concrete work 1:1 ½ :3 (1 Cement :1 ½ Sand : 3 graded stone aggregate 20mm nominal size)and curing complete excluding cost of form work and reinforcement for reinforced cement concrete work in | |||||
| 5.01 | i) In foundations ,footings bases of columns and the like and mass concrete work complete in all respects | 23.64 | Cum | - | - |
| 5.02 | ii) In Walls any thickness (but not less than 0.10meter thickness including attached pilasters, buttresses plinth and string courses etc. from top of foundation(level) upto floor two level including all leads and lifts etc. complete in all respects | 37.35 | Cum | - | - |
| 6 | Providing, and installation of screen bars in SS304 ( 1350*10*40 )mm complete work with in all leads and lifts as per the entire satisfaction & direction of the Engineer-in-charge | 73.44 | Kg | - | - |
| 7Providing form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm so as to give a fair finish I/c centring , shuttering , strutting and proping etc.with wooden battens and ballies, height of propping and centring below supporting floor to ceiling not exceeding 4mtrs. and removal of the same for insitu- reinforced concrete & plain concrete work in:- | |||||
| 7.01 | a) Vertical surfaces such as walls(any thickness )partition and the like including attached pillasters, buttresses plinth and string courses and like including all leads and lifts etc. complete in all respects. | 275.13 | Sqm | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.54 MB
FORMSIX.pdf
Tender Documents • 0.38 MB
TERMANDCONDITION.pdf
Tender Documents • 0.35 MB
BOQ_191179.xls
BOQ • 0.30 MB
FORMEIGHT.pdf
Tender Documents • 1.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .