Loading…
Loading…
37,705 results • Best match
WS835 Remodeling Upgrading the existing Storm water drainage system on S V road from Turner Road Junction to P D Hinduja road junction East and West Side falling in Jurisdiction of H West ward Western suburbs
... / Upgrading the existing Storm water drainage system on S V road i.e., ...
Construction of Brick Masonary Storm Water Drainage with RCC Covering slab from the Junction of Kazi Nazrul Islam Lane to Green Club at Joynal Abedin Road in Ward No 18 Booth No 84 under APAS within Krishnanagar Municipality SL NO 17
... Construction of Brick Masonary Storm Water Drainage with RCC Covering slab from ...
WS 836 Remodeling Upgrading the existing Storm water drainage system on S V road from P D Hinduja road junction to Saraswati road East and West Side falling in Jurisdication of H West ward Western suburbs
... / Upgrading the existing Storm water drainage system on S V road i.e., ...
Formation of Industrial Layout, Including Construction of Flexible Pavement Roads, RCC Side Drains, RCC Chambers, RCC Storm Water Drains, RCC Cross Drainages, Laying of HDPE Pipes for Water Supply Works etc., at proposed Chintamani Industrial Area, Phase-I, Chikkaballapura District
... Drains, RCC Chambers, RCC Storm Water Drains, RCC Cross Drainages, Laying of HDPE Pipes for ...
Annual Maintenance of Storm Water Drainage System in Sectors 1 to 23, Gurugram for Monsoon Season 2026, including Deployment of Manpower, Hiring of Machinery, Repair and Maintenance of Drains, and all other works contingent thereto
... person per 2 km for upkeep of drainage network in a length of 78.709km ...
Construction of 1 (One) no 1200 mm dia HP Culvert for drainage of Storm Water at Chainage 29.805 Km of Dahijuri - Binpur - Silda - Hatiary Road under Jhargram Highway Division in the district of Jhargram.
Cleaning of existing road gullies, manholes and allied system for proper Storm Water Drainage at various Non Residential i.e. Schools, Sport, Institutions and other building under SDE Water Supply Sub Divn. No. 2, Chandigarh (period for 3 months) (Ch
Construction/Repair of New and Existing Footpaths, Construction of Road Gully Chambers for Storm Water Drainage on 18 Mtr Road, Thermoplastic Paint Road Marking and Other Allied Road Beautification Works in Sector-46, Ward No. 14, Division-1B, Zone-1
... Road Gully Chambers for Storm Water Drainage on 18 Mtr Road, Thermoplastic ...
Construction of Storm Water Drainage at Sayakara Street Main Lane (087010L087), Maruthai Lane (087010L092), Thiyagi Kumaran Street Lane-2 (087010L090), Thiyagi Sangaralinganar Street East Lane (087010L096), Venu Santhu-2 (087010L095) Ward No.10
REPAIR TO STORM WATER DRAINAGE SYSTEM, INCLUDING OTHER MISC B/R ITEMS AND DAY TO DAY CLEANING AND REPAIRS TO SEWAGE SYSTEM INCLUDING ALLIED ITEMS AT NCHC POWAI AND NCHC ULHASNAGAR UNDER GE (NW) BHANDUP
... Cleaning and desilting of area storm water closed drainage/culvert of inner girth above ...