Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.8 CrAdmitted-Finance | -2.50% | ₹4.8 Cr | L1 | Admitted-Finance |
| 2 | L2₹4.9 CrAdmitted-Finance | -2.05% | ₹4.9 Cr | L2 | Admitted-Finance |
| 3 | L3₹4.9 CrAdmitted-Finance | -1.80% | ₹4.9 Cr | L3 | Admitted-Finance |
| 4 | L4₹4.9 CrAdmitted-Finance | -1.29% | ₹4.9 Cr | L4 | Admitted-Finance |
Tender Value
₹5.0 Cr
EMD Value
₹11.7 L
Closing Date
12 May 2026, 5:00 pmClosed
GM JAL
Sector-5, Noida
Strengthening of Sewerage (Diversion, Construction of R.C.C. Drain and Sumpwell with Rising Main Line for Disposal of storm Water and Sewerage along with irrigation Drain Nr. Kendriya Vihar Sector-51), Noida.
2026_NOIDA_1145666_1
01/SM-JAL-III/2026-27
Open Tender
Civil Works - Others
365 days
NOIDA
Please refer to tender document
3 documents required · 3 mandatory
₹8,260
NOIDA
₹11.7 L
29 May 2026
6 May 2026
13 May 2026
6 May 2026
12 May 2026
6 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mecanical means (hydraulic excavater)/ manual means in over areas (exceeding 30 cm in depth, 1.5m in width as well as 10 sqm on plan) i/c disposal of excavated earth, lead up to 50 m and lift up 1.5, disposed earth to be levelled and neatly dressed in all kind of soil.The contractor has to detect different utilities like sewer line, water supply line, electric cable, telephone cable, gas pipe line etc. using utility detecting machine before start of excavation and shall start excavation only after getting permission of E/I. | 11,163 | Cum | 136 | ₹15,18,168 |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 5,838 | Cum | 93 | ₹5,42,934 |
| 3Extra for every additional lift of 1.5 or part thereof in all kind of soil. | |||||
| 3.01 | a) 1.50 - 3.00 m | 2,585 | Cum | 15.8 | ₹40,843 |
| 3.02 | b) 3.00 - 4.50 m | 2,379 | Cum | 31.6 | ₹75,176.4 |
| 3.03 | c) 4.50 - 6.00 m | 900 | Cum | 47.4 | ₹42,660 |
| 3.04 | d) 6.00 - 7.50 m | 900 | Cum | 63.2 | ₹56,880 |
| 3.05 | e) 7.50 - 9.00 m | 900 | Cum | 79 | ₹71,100 |
| 3.06 | f) 9.00 - 10.50 m | 600 | Cum | 94.8 | ₹56,880 |
| 4Cement Concrete with 4 cm gauge approved stone ballast, coarse sand & cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. | |||||
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.06 MB
BOQ_2141832.xls
BOQ • 0.47 MB
TD01.pdf
Tender Documents • 2.08 MB
C01.xls
Additional Documents • 0.04 MB
Download all tender documents and submit your bid