Loading…
Loading…
30,847 results • Best match
PROVIDING SEWERAGE SYSTEM IN PIPLI, BIR PIPLI and 6.50 MLD INTERMEDIATE PUMPING STATION FOR PIPLI, BIR PIPLI
Providing, Supplying, erection, testing and commissioning of NON CLOG SUBMERSIBLE SEWAGE PUMPSET(Power Driven Submersible pumps primarily designed for handling waste water with End Suction Enclosed Impeller and Volute Casing) sets fitted with effective motor, mechanical seal, thermal and moisture sensor, suspension device, anti coupling bracket, 10 m guide pipe and Cable From Sump Well to pump Chamber including LT PMU autocoupling with integral bend (with autocoupling Pin SS Foundation Bolt Complete with base frame and RCC Foundation) complete in all respects as per scope of work and specification of Non Clog submersible pumpset of discharge 453 cum/hr, and 45 m head (150HP).
Annual maintenance estimate of Water Supply Sewerage Scheme in Sector 4 Rewari for the year 2025 2026
Annual maintenance estimate of Water Supply, Sewerage Scheme in Sector-6, Dharuhera for the year 2025-2026
Annual maintenance estimate of Water Supply, Sewerage Scheme in Sector-4A, Dharuhera for the year 2025-2026
Annual maintenance estimate of Water Supply Sewerage Scheme in Sector 6 Dharuhera for the year 2025 2026
[17.24]Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per technical clause 406 of MORT&H specifications
Annual maintenance estimate of Water Supply Sewerage Scheme in Sector-4A Dharuhera for the year 2025 2026