Loading…
Loading…
31,388 results • Best match
Replacement of demolished drainage line by new drainage line according to necessity in various streets of parsi mohalla under ward 63 of zone 18.
Regarding the maintenance work of the drainage behind Sangam Nagar G.T.S. and Govind Colony drainage under Zone No. 04, Ward No. 12. (Second call)
Regarding the maintenance work of the drainage behind Sangam Nagar G.T.S. and Govind Colony drainage under Zone No. 04 Ward No. 12.
Closing of Fishery feeding pipe near Jalpath in Block Bhangor II under Calcutta Drainage Outfall Sub-Division no-II under Calcutta Drainage Outfall Division
Tender Inviting Authority: Executive Engineer, Calcutta Drainage Outfall Division, Irrigation & Waterways Directorate, Government of West Bengal, Jalasampad Bhawan (6th. floor) Salt Lake City, Kolkata -700091.
PNLR MLTY 2025-26 PRNO 469 Construction of Poovalamkai Chathamath Road Drainage-NLR MLTY 2025-26 PRNO 469 Construction of Poovalamkai Chathamath Road Drainage
Drainage Construction
C/O RCC Manhole Chamber 1.5 mtr deep 245 Nos 2.5 mtr deep 24 Nos C/O Flushing Points 36 Nos C/O Prefabricated Manhole 600x600 13 Nos Repair of Panchyat Foothpath to be damaged during laying of sewer line Providing Laying jointing and test
The work shall be executed as per HPIPH specifications, CPHEEO manual with latest amendments on sewerage and sewage treatment, relevant IS codes and to the entire specification of the Engineer-in-Charge.
C/o Manhole Chamber 2 Nos and C/o RCC Pillars 5 Nos and Stone Masonry platform 3 Nos near DEO Office Jail Road
Excavation in foundation and trenches in earth work upto all depth in all kinds of soil such as pick work jumper work, blasting work,chiselling of soft /hard rock where blasting is prohibited in all leads and lifts and including trimming of sides levelling of bed to correct grade stacking the excavated soil in 15 cm. layers when required into plinth sides of foundation including consolidating each deposited layer by ramming and watering and then disposing oof all surpius excavated soil as directed in all leads and lifts and soring/strutting timbering and dewatering where ever required to the entire satisfaction of the Engineer-in-Charge.