| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.1 LAccepted-AOC | ₹4.1 L Quoted ₹4.7 L | L1 | Accepted-AOC Lowest |
| 2 | L2₹4.8 LRejected-AOC | ₹4.8 L | L2 | Rejected-AOC Other than Lowest |
| 3 | L3₹4.9 LRejected-AOC | ₹4.9 L | L3 | Rejected-AOC Other than Lowest |
| Sl No | Description | Qty | Unit | Ramesh Kumar Chaudhary L3 | Vikram Guleria L1 | BILBIR SINGH L2 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundation and trenches in earth work upto all depth in all kinds of soil such as pick work jumper work, blasting work,chiselling of soft /hard rock where blasting is prohibited in all leads and lifts and including trimming of sides levelling of bed to correct grade stacking the excavated soil in 15 cm. layers when required into plinth sides of foundation including consolidating each deposited layer by ramming and watering and then disposing oof all surpius excavated soil as directed in all leads and lifts and soring/strutting timbering and dewatering where ever required to the entire satisfaction of the Engineer-in-Charge. | 7.71 | Cum | 450 ₹3,469.50 | 380 ₹2,929.80 | 400 ₹3,084 |
| 2.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:3:6 (1 Cement : 3 coarse sand): 6 graded stone aggregate 40 mm nominal size) in all leads and lifts. | 3.19 | Cum. | 6,600 ₹21,054 | 6,500 ₹20,735 | 6,550 ₹20,894.50 |
| 3.00 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level 1:1.5:3 (1 cement 1:5 coarse sand): 3 graded stone aggregate 20 mm in all leads and lifts. | 2.47 | Cum. | 8,200 ₹20,254 | 8,100 ₹20,007 | 8,150 ₹20,130.50 |
| 4.00 | Centering and shuttering including strutting, propping etc. and removal of form for all heights: Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.in all leads and lifts. | 90.72 | Sqm. | 600 ₹54,432 | 510 ₹46,267.20 | 560 ₹50,803.20 |
| 5.00 | Centering and shuttering including strutting, propping etc. and removal of form for all heights: Suspended floors, roofs, landings, balconies and access platform in all leads and lifts. | 3.48 | Sqm. | 575 ₹2,001 | 500 ₹1,740 | 550 ₹1,914 |
| 6.00 | Centering and shuttering including strutting. propping etc. and removal of form for all heights: Edges of slabs and breaks in floors and walls under 20 cm wide in all leads and lifts. | 30 | Rmt. | 195 ₹5,850 | 150 ₹4,500 | 170 ₹5,100 |
| 7.00 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering. huttering, fir ishing and reinforcement 1:1.5:3 (1) cement: 1.5 coarse sand): 3 graded stone aggregate 20 mm in all leads and lifts. | 11.12 | Cum | 11,000 ₹1.2 L | 10,800 ₹1.2 L | 10,950 ₹1.2 L |
| 8.00 | Reinforced cement concrete work in beams. suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the entering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement: 1.5 coarse sand): 3 graded stone aggregate 20 mm nominal size) in all leads and lifts. | 1.4 | Cum | 9,950 ₹13,930 | 9,800 ₹13,720 | 9,900 ₹13,860 |
| 9.00 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Mild steel and Medium Tensile steel bars in all leads and lifts. | 1,341.9 | Kg | 98 ₹1.3 L | 95 ₹1.3 L | 97 ₹1.3 L |
| 10.00 | Fixing of Precast SFRC Manhole Cover with Frame conforming to IS-12592 (Part -1)-1998 with latest ammendments 560 mm dia in all leads and lifts.i) Medium Duty | 6 | Nos. | 270 ₹1,620 | 220 ₹1,320 | 250 ₹1,500 |
Tender Value
₹4.7 L
EMD Value
₹9,500
Closing Date
15 Jan 2026, 5:00 pmClosed
Executive Engineer
E JSV Mandi
C/o Manhole Chamber 2 Nos and C/o RCC Pillars 5 Nos and Stone Masonry platform 3 Nos near DEO Office Jail Road
2026_HPIPH_125106_1
15914-16013
Open Tender
Civil Works
90 days
Mandi
Please refer Tender documents.
6 documents required · 6 mandatory
₹500
₹9,500
17 Mar 2026
6 Jan 2026
16 Jan 2026
6 Jan 2026
15 Jan 2026
6 Jan 2026
Amount
Excavation in foundation and trenches in earth work upto all depth in all kinds of soil such as pick work jumper work, blasting work,chiselling of soft /hard rock where blasting is prohibited in all leads and lifts and including trimming of sides levelling of bed to correct grade stacking the excavated soil in 15 cm. layers when required into plinth sides of foundation including consolidating each deposited layer by ramming and watering and then disposing oof all surpius excavated soil as directed in all leads and lifts and soring/strutting timbering and dewatering where ever required to the entire satisfaction of the Engineer-in-Charge.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:3:6 (1 Cement : 3 coarse sand): 6 graded stone aggregate 40 mm nominal size) in all leads and lifts.
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level 1:1.5:3 (1 cement 1:5 coarse sand): 3 graded stone aggregate 20 mm in all leads and lifts.
Centering and shuttering including strutting, propping etc. and removal of form for all heights: Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.in all leads and lifts.
Centering and shuttering including strutting, propping etc. and removal of form for all heights: Suspended floors, roofs, landings, balconies and access platform in all leads and lifts.
Centering and shuttering including strutting. propping etc. and removal of form for all heights: Edges of slabs and breaks in floors and walls under 20 cm wide in all leads and lifts.
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering. huttering, fir ishing and reinforcement 1:1.5:3 (1) cement: 1.5 coarse sand): 3 graded stone aggregate 20 mm in all leads and lifts.
Reinforced cement concrete work in beams. suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the entering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement: 1.5 coarse sand): 3 graded stone aggregate 20 mm nominal size) in all leads and lifts.
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Mild steel and Medium Tensile steel bars in all leads and lifts.
Fixing of Precast SFRC Manhole Cover with Frame conforming to IS-12592 (Part -1)-1998 with latest ammendments 560 mm dia in all leads and lifts.i) Medium Duty
Carriage of Excavated soil from site to Dumping station at Bindravani in all leads and lifts.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering All work up to plinth level 1:5:10 (1cement :5 coarse sand) : 10 graded stone aggregate 40 mrn nominal size in all leads and lifts.
Coursed rubble masonry (second sort) with hard stone in foundation & plinth with with Cement mortar 1:6 (1 cement : 6 coarse sand) in all leads and lifts
15 mm cement plaster on rough side of single or half brick wall of mix: 1:4 (1 cement: 4 coarse sand) in all leads and lifts.
BILBIR SINGH (BID ID -609246)
Ramesh Kumar Chaudhary (BID ID -609253)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.60 MB
Form6.pdf
Tender Documents • 0.58 MB
BOQ_184191.xls
BOQ • 0.29 MB
Form8.pdf
Tender Documents • 1.23 MB
Download all tender documents and submit your bid