Loading…
Loading…
280 results • Latest
(Sub Head -Construction of retaining wall Near Toilet Block between RD. 0/015 to 0/055) under Edu. Deposit SID- SDF-2025/1119)
Earth work in excavation for structures in all depths as per drawing and M.O.R.D.technical specification section 300 & 1600 including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal in all lead and lift including dressing of sides and bottom and back filling in trenches with excavated Suitable materials. All work of rock cutting by blasting shall be carried out by taking all necessary precautions against soil erosion, damage to hill side, water pollution etc. and to protect stability of hill side rock shall be excavated with chiseling and wedging out rock (where blasting is prohibited). All earth work in cutting/excavation including rock excavation shall be carried out true to lines grades, side slopes, width, camber super elevation and level as shown on the drawings or as directed by the Engineer-in-Charge, hauling and stacking of materials useful for construction at suitable sites and safe disposal of unsuitable cut materials in specified manner, filling of unevenness and finishing the road to specified dimension or as directed by the Enginer-in-Charge. If the foundation of the structure is in an area with stagnant water or water is met with in the excavation due to spring seepage, rain and other causes it shall be removed by suitable diversion, bailing out or pumping as directed and the area of the foundation or embankment shall be kept dry. Any loss to the public or private property during the course of excavation shall be the whole responsibility of the contractor which shall have to be duly compensated by him at his own cost .The rate is inclusive all taxes levy by the government time to time including GST.
as per BOQ
Wiring for light point / fan point / exhaust fan / call bell point with 1.5 Sq. mm. PVC insulated heat resistant flame retardant (HRFR) and low smoke single core (flexible) copper conductor cable in PVC casing & capping and earthing the light point with 1.5 Sq.mm. HRFRLS/PVC insulated single core copper conductor cable complete in all respect with in all leads and lifts as per the direction and satisfaction of Engineer-in-Charge. Group C.
as per BOQ
Operation, running and maintenance of scheme as per the entire satisfaction of the Engineer-in-Charge.
as per BOQ
SUPPLY, CARRIAGE STACKING & TESTING OF FOLLOWING ITEMS.
as per BOQ
Providing and fixing of Soft Starter L&T make fully automatic 40 HP complete in all respect with in all leads & lifts as per the entire satisfaction of the Engineer-in-Charge.
as per BOQ
Operation, running and maintenance of scheme as per the entire satisfaction of the Engineer-in-Charge.