Loading…
Loading…
265 results • Latest
Providing and Fixing additional Earthing 132KV D/C Transmission Line from Larji to Kangoo (Express feeder) under Electrical System Sub-Division, HPSEBL, Sundernagar under Electrical System Division HPSEBL Bilaspur.
Hiring of Diesel driven vehicle i.e Mahindra Bolero, or equivalent w.e.f. 01.04.2026 to 31.03.2027 Attached with F.A Wing, Arb. Cell, General Pool
Hiring of Diesel driven vehicle i.e Mahindra Bolero or equivalent for Shift Duty w.e.f. 01.04.2026 to 31.03.2027.
Construction of Retaining wall at R.D. 0/00 to 0/025)
Earth work in excavation for structures as per drawing and technical specifications clause 305.1 including setting out , construction of shoring and bracing, removal of stumps and other deleterious materials and disposal upto a lead of 50.00 metres, dressing of sides and bottoms and back filling in trenches with excavated suitable materials including carriage of material with in all leads and lifts and other incidental complete as per direction of Engineer-in-Charge.
as per BOQ
Operation, running and maintenance of scheme as per the entire satisfaction of the Engineer-in-Charge.
(Sub Head -Construction of retaining wall Near Toilet Block between RD. 0/015 to 0/055) under Edu. Deposit SID- SDF-2025/1119)
Earth work in excavation for structures in all depths as per drawing and M.O.R.D.technical specification section 300 & 1600 including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal in all lead and lift including dressing of sides and bottom and back filling in trenches with excavated Suitable materials. All work of rock cutting by blasting shall be carried out by taking all necessary precautions against soil erosion, damage to hill side, water pollution etc. and to protect stability of hill side rock shall be excavated with chiseling and wedging out rock (where blasting is prohibited). All earth work in cutting/excavation including rock excavation shall be carried out true to lines grades, side slopes, width, camber super elevation and level as shown on the drawings or as directed by the Engineer-in-Charge, hauling and stacking of materials useful for construction at suitable sites and safe disposal of unsuitable cut materials in specified manner, filling of unevenness and finishing the road to specified dimension or as directed by the Enginer-in-Charge. If the foundation of the structure is in an area with stagnant water or water is met with in the excavation due to spring seepage, rain and other causes it shall be removed by suitable diversion, bailing out or pumping as directed and the area of the foundation or embankment shall be kept dry. Any loss to the public or private property during the course of excavation shall be the whole responsibility of the contractor which shall have to be duly compensated by him at his own cost .The rate is inclusive all taxes levy by the government time to time including GST.