Loading…
Loading…
1,352 results • Best match
supply of composite processing items
Solar LED Torch Light
ICT 01 Central Computerized System for Monitoring at Head Quarter
Comprehensive Operation & maintenance of all equipment(hardware, software, all control center equipment & associated systems) installed under this contract with preventive and predictive maintenance, replacement & repair for a period of five (5) years The Bidder shall consider the below mentioned requirements(a-f) for each year of comprehensive operation & maintainance. Comprehensive O&M for 1st year a)Man Power for running the command center as per specifications, security staff, + all required manpower for carrying out comprehensive & predictive O&M+ manpower for carrying out repair works/replacement works(inclusive of all incidentals, travel & boarding cost ) +manpower as required for integration of new and all other facilities that shall be made available for integration with the command center along with data analytics, dashboards, reports as required ,+ all other manpower & related cost required under the specifications for carrying out comprehensive O&M b)Data Communication cost between various remote sites with centralized command center inclusive of leased line and related costs ,high speed broadband internet charges, Telephone/smartphone(Andriod /IOS) recurring monthly & yearly costs, all other communication costs plus incidental cost as required under the specifications for carrying out comprehensive O&M c)All software licensing, regular software patch upgrade for all software as and when made available by OEM with time stamping, applicable for all machines installed in the control center, servers, server components, display wall video controllers software, cyber security audit,etc. plus all other software's licensing and related incidental cost as required under the specifications for carrying out comprehensive O&M d)Operation & maintenance of the IOT software modules inclusive Real time asset management system inclusive of all addition, deletion of equipment/documentation available during the O&M period .Cyber security for the centralized command center & installed components to prevent any cyber/hacking attacks , intrusion protection & antivirus protection for all components, Software programming & integration of newly added plants/locations with all field data to be integrated to the command enter as applicable with analytics, dashboards, reports, synoptical views, interoperability test procedures, communication checks with all remote sites at regular intervals, communication checks with all networked components in the control center, Integration with all servers and machines installed at control center. e)Operation & maintenance of all electrical equipment installed at the control center, inclusive of UPS system with batteries, security of all installed systems, equipment, all electrical equipment, etc +All other items and incidental cost as required under the specifications for carrying out comprehensive O&M. f)All other miscellaneous items and incidental cost as required under the specifications for carrying out comprehensive O&M for period of 5 years.
Electrical Material for Construction and Maintenance Work
LED Pole light Waterproof 50 watt (Havells, Crompton, Bajaj, Wipro, Syska, Orient)
Electricity Material
LED Flood Light 30 watt (ISI Mark) Branded
Anti Freezing System for water supply in High Altitude
Heavy-duty Power Distribution Panel containing Type-C/D curve Miniature Circuit Breakers (MCBs), Earth Leakage Circuit Breakers (ELCB/RCCB), and coordinated Type 1 + Type 2 Surge Protection Devices (SPDs) per IEC 61643-11.
Spanner Set, Screw Driver, Metal Cutting Wheel, MS Hexagonal Head Bolts and other items
Rechargeable LED Torch light & Lantern,2200 mAH battery minimum 4 Hrs backup make Philips ,Syska / ISI Make