Loading…
Loading…
10,287 results • Best match
(1)Construction of 30 beds RPF Barrack Male at NITR (including electrical works), (2) Provision of Escalators at Netaji Subhash Chandra Bose Itwari (NITR) Station.
D-Non schedule items (Electrical work, Supply part) Note: 1 The work to
REPAIR/MAINTENANCE OF OVERHEAD (OH) LINES AND UG CABLES, INCLUDINNG ROUTINE PREVENTIVE AND BREAKDOWN MAINTENANCE OF TRANSFORMERS, AB SWITCHES, LIGHTNING ARRESTERS (LAs), EARTHING SYSTEMS AND ALL ASSOCIATED ALLIED ELECTRICAL WORKS, AT ZONE- II B AND
Supply and laying in replacement of GI tubing 100 mm dia, light grade for cable protection at road crossing / on poles and tubing sealed at both ends after laying the cables complete all as directed.
Electrical work for Upgradation of Haridwar Aithal,Pathri,Ikkar,Jwalapur, Motichur,Rishikesh, Laksar stations.
including making chase & plastering after laying of cable/digging of cable trench, sand cushioning,
Daily operation of Pump Motor Set including minor repair and alteration of electrical works such as main switch starter etc at Sudakshina Police Housing Estate at Garia
Daily operation of Pump Motor Set including minor repair & alteration of electrical works such as main switch, starter etc. at Sudakshina Police Housing Estate at Gariar 2 Shifts 1 Nos Pump Operator = 2 Nos Operator per day 3 X 365 = 730 Operators
ARC for Laying of Various size of 11 KV XLPE/PILC UG Cable under ND/SI & DISS Scheme works & Maintenance of Faulty cable under jurisdiction of WADI Sub Division & other subdivision under CFC Lalbaug Division
removal of old cable & laying of new cable on sand bed. The
ARC for Laying of Various size of 11 KV XLPE/PILC UG Cable under ND/SI & DISS Scheme works & Maintenance of Faulty cable under jurisdiction of LALBAUG Sub Division & other subdivision under CFC Lalbaug Division
removal of old cable & laying of new cable on sand bed. The