Loading…
Loading…
9,915 results • Best match
Operation and Maintenance Of Electrical Systems/Electrical Installations - As per RFQ No 12036
Operation and Maintenance Of Electrical Systems/Electrical Installations - As per RFQ No 12036
S.I.T.C of new Lift of suitable capacity in replacement of the existing old Lift in existing lift well and allied Electrical Installation work at G 10 storied Academic building within Alipore campus of University of Calcutta. ---S.I.T.C of new Lift
SITC of new Automatic Lift ( as per manufacturer design & as per detailed specification below conforming to relevant IS ) and putting into operation after final testing in the existing lift shaft complete with all accessories and repairing the damage wall / floor if any etc to complete as reqd. Before installation of new Lift, the existing old Lift installation is to be dismantled and kept in safe/proper place as per direction of E.I.C/Authority
Tender for ARC Work for Laying, Testing & Commissioning of 11/22KV Underground XLPE cable(185 SQ MM XLPE cable by DGVCL) with cable end termination & straight jointing kits (by contractor) and fault finding work under various scheme for Bardoli Town sub division under Bardoli Division.
Restructuring works for construction of Vallapuzha ROB In F/O Deputy General Manager, RBDCK Kochi under Electrical Section Vallappuzha (RW-6703-202526-148)
926 - Excavation of cable trench of appropriate size ( normally 1.2m deep and 0.35m /0.5m wide for single/double run) in all classes of soil including breaking clods, watering, ramming and sectioning of soil bank etc. and back filling the soil after cable laying and consolidating the soil in layers of 75cm (excluding laying of cable).
Daily operation of Pump Motor Set including minor repair and alteration of electrical works such as main switch starter etc at West Bengal Police Telecom Head Quarter
Daily operation of Pump Motor Set including minor repair & alteration of electrical works such as main switch, starter etc. at West Bengal Police Telecom Head Quarter 2 Shifts 1 Nos Pump Operator = 2 Nos Operator per day 2 X 365 = 730 Operators
Composite work (Civil & Electrical Genl) for setting up of Quick coach watering system at koteganguru yard.
L.T. Earthing arrangements for hard soil using 50 mm C-Class GI Pipe- 2.7 Mtr length, 2 soil treatment by spreading of 25 kgs each of salt and charcoal, duly painting eath pit with black paint and stenciling of earth resistance value with date, including supply and laying of 6 SWG G.I. wire and other hardware to connect equipment at site complete.