Loading…
Loading…
10,628 results • Best match
Operation and Maintenance of Electrical and Mechanical Installations of NKN Data Centres 3rd floor at NIC A Block BRKR Bhawan Hyderabad during 2026-27. SH AMC of 4 Nos. 10TR PAC units Vetive make. Subwork/Packages: AMC of 10 TR PAC
Electrical work in connection with [1] Provision of additional PF Shelter at AWR, RHG, KRH, BU, MKH, PSL, HIS, AIA, GLNA, KNAR, MJNL & SRRG, [2] Provision of additional PF Shelter at BKI, DO, ARNA, BAK, JW, JHIR & KUT, [3] Provision of RCC over head ... of Electric Lifting ...
Description:- Horizontal Directional Drilling (HDD)/Boring and trenchless cabling. Supply, transportation and insertion of self lubricated HDPE pipe and laying of cables in boring under the
REPAIR RENOVATION AND INSTALLATION ELECTRIC WORKS AT DRDC OFFICE BUILDING IN THE DISTRICT OF DAKSHIN DINAJPUR
REPAIR RENOVATION AND INSTALLATION ELECTRIC WORKS AT DRDC OFFICE BUILDING IN THE DISTRICT OF DAKSHIN DINAJPUR
Annual Maintenance and repair of Electrical Installation of State Health Transport Organization Building ------ Annual Comprehensive servicing and preventive maintenance of Split and Cassette AC Machine..
Bidder have to ensure payment to work person current minimum rate of wages of Jt. Labour Commissioner, Govt. of W.B.
MAINTENANCE OF VARIOUS TYPE OF EARTHING AND LIGHTENING ARRESTER AT VARIOUS LOCATIONS UNDER GE (AF) MARATHAHALLI
Taking down old unserviceable earth pit and M/L for earthing complete with galvanized steel earth plate electrode 600X600X6mm thick buried directly in ground (earth pit not less than 2.25m deep below normal ground level) with top edge of the plate not less than 1.5M below normal ground level connected to GI earth strip 32 x 6 mm dia by means of nuts, bolts, check nuts and washer of GI steel and connecting to testing point including provision of test point and all as shown in electrical plate No. 3 of SSR Pt I. The work is inclusive of necessary earth work and PCC chamber in RCC (1:2:4) Type B-1using 20mm crushed stone aggregate with 8 CTD bar reinforcement both ways at 140 mm centre to centre complete all as directed by Engr-in-Charge. Note:- (i) GI earth lead beyond 7.5M shall be measured and paid separately. (ii) The rate include measuring earth resistance (iii)Weather coating paint will be done over chamber and inclusive in the above rate quoted .
RMO Electrical and Mechanical Services in various Building under M-4512 (SH- Supplying installation testing and commissioning of OEM Toner cartridge at various VVIP Premises).
Supplying, Installation, Testing & Commissioning of 222 A printer cartridges (Black, Cyan, Magenta, Yelow)/ toner suitable for installed printers (Make :- HP)