Loading…
Loading…
10,157 results • Best match
Construction of teachers quarter at High School Nagbal B.W.O Electric Work
Wiring for light point/ fan point/ exhaust fan point/ call bell point with 1.5 sq.mm FRLS PVC insulated copper conductor single core cable of Polycab /Finolex /RR Kabels /Anchor /Salzer/Apar/ Grandlay/ eq. make to be approved by EIC in surface / recessed medium class PVC conduit (including cost of p/l of 25 mm dia PVC Conduits with allied accessories including cutting of walls /floors with hydraulic cutters and refacing to original position by way of cement plastering /pop / paiting etc complete job including cost of conduits and allied accessories like bends . fan deeps/Fan hooks with fastners etc ) , with 6Amps modular switch, modular plate of Anti backteria series of Schneider /ABB /L&T /Legrand /Simens/ eq. make to be approved by EIC , suitable GI box and earthing the point with 1.5 s q.mm FRLS PVC insulated copper conductor single core cable etc. as required. ( P+N+E) for Normal and invertor points per room is to be provided seperately).The Job further includes providing and fixing of heavy duty Metallic conceled deeps and Fan junction deeps of standard make dully isi marked (to be approved by EIC before installation) actual numbers to be provided as per site requirement and as per instructions of EIC complete job
Dr Ambedkar Nagar (DADN)-Provision of new Integrated crew lobby, CTCC Office, counselling room, TRS staff Room with parking & boundary wall at including electric work
JCB Backhoe Loaders 3DX Plus or similar with Hour minimum 1.10 cum bucket capacity Total 9306.99 Schedule C-Ratlam Division - Dr. Ambedkar Nagar (DADN) - Electrical work in connection with provision of Schedule new integrated crew lobby, CTCC Office, counselling room, TRS staff Room with parking & boundary wall at DADN Ratlam Division - Dr. Ambedkar Nagar (DADN) - Electrical work in connection with provision of new Item- 1 integrated crew lobby, CTCC Office, counselling room, TRS staff Room with parking & boundary wall at DADN S No. Item No Description of Item Unit Qty Rate Amount
Construction of 500 Capacity Multipurpose Hall at Polytechnic College Campus Dist-Mandla (M.P.) With Electrification Works (1st Call)
Construction of 500 Capacity Multipurpose Hall at Polytechnic College Campus Dist-Mandla (M.P.) With Electrification Works (1st Call)
Electrification Work in New 60 M. and 48 M. Sheds at New (Additional) Mandi Yard Neemuch, Distt. Neemuch
Electrification Work in New 60 M. & 48 M. Sheds at New (Additional) Mandi Yard Neemuch, Distt. Neemuch
External Electrification with Transformer and High mast at Additional Yard of Krishi Upaj Mandi samiti Narsinghpur Distt. Narsinghpur
External Electrification with Transformer and High mast at Additional Yard of Krishi Upaj Mandi samiti Narsinghpur Distt. Narsinghpur
Development of Sheetal Bagh Park at Gurez BWO Electric work
ENVIRONMENTALLY SAFE MAINTENANCE FREE COPPER ROD EARTHING SYSTEM Necessary soil treatment is to be made by the contractor in order to improve the Pit resistance Value.Supply,Installation and Testing of 75 mm copper Pipe Filled with Crystalline conductive Mixture with Eco friendly GEM Backfill Compound 2No. Bags also having Earth pit chamber (300mm x 300mm) with man- hole cover for the above. Including cost of 20mm Wide copper strip as required in one run fitted with of brass nut bolt & spring washer from EARTHING ROD up to MAIN Control PANEL through suitable DWC High Density Poly ethylene Pipe having Corrugation complete job.