Loading…
Loading…
10,207 results • Best match
Construction of Additional Block for PHC Duroo, Sopore Baramulla B.W.O Electric work
ENVIRONMENTALLY SAFE MAINTENANCE FREE COPPER Rod EARTHING SYSTEM Necessary soil treatment is to be made by the contractor in order to improve the Pit resistance Value .Supplying, Installation and Testing of 75 mm copper Pipe Filled with Crystallineconductive Mixture with Eco friendly GEM Backfill Compound 2No. Bags also having Earth pit chamber (300mm x 300mm) with man- hole cover for the above. Including cost of 2OMM Wide copper strip as required in one run fitted with of brass nut bolt & spring washer from EARTHING ROD up to MAIN Control PANEL through DWC High Density Poly ethylene Pipe having Corrugation complete job
COMPREHENSIVE MAINTENANCE TO REPAIR REPLACEMENT OF INTERNAL ELECTRIFICATION AND CONNECTED WORKS IN OTM AND MD ACCN UNDER AGE EM II OF GE (SOUTH) MEERUT
M & L for Sand cushioning to UG cables (8cm deep before laying of cable and 15 cm deep over the cable). Note :- Punned thickness only will be considered for payment.
REPAIR AND MAINT OF INTERNAL ELECTRIFICATION AND CONNECTED ITEMS IN MD AND OTM ACCN IN INSIDE AND OUTSIDE DEPOT UNDER GE BANAR
M&L for Earthing complete with galvanised steel earth plate electrode 60cm×60cm× 6mm thick, buried directly in ground (earth pit not less than 2.25 metres deep below ground level) with top edge of the plate not less'than 1.5 metres below normal ground level, connected to galvanised earth lead wire 4.0mm dia by means of bolts, nuts, check nuts and washers of galvanised iron or steel all as shown in electrical plate connected to earthing test point all as specified or indicated including testing on completion.
Open tender for Zonal works for Divisional Rly. Hospital, Electric Loco Shed & MEMU Shed including minor Road, Wood, Pipe Laying , Sanitary Installation works within the jurisdiction of SSE/ Works/West/Asansol in zone no.14 of Asansol division for the period commencing from 01.07.2026 to 30.06.2027.
REPAIR/MAINT OF WATER SUPPLY DISTRIBUTION NETWORK SYSTEM PIPE LINE WITH FITTINGS AT POCKET I AND REPAIR/MAINT OF VARIOUS CAPACITIES OF PUMP SETS, EARTHING AND CONNECTED WORKS AT CHAF BANGALORE
Dismantling and taking out the existing unserviceable mono block centrifugal pump set by disconnecting the cable connection suction and delivery pipe lines of the pump set, separate the motor from pump, transporting to civil workshop, removing the burnt out winding from slots, cleaning the stator and rotor slots with CTC and emery paper and rewinding , varnishing and heating the motor with as per existing size of new super enamelled copper winding wire and insulating by using class ‘B’ insulation keeping for drying, bring back to site, reassemble the motor and pump, fixing in position, connecting electric connections testing and commissioning for its satisfactory performance complete all as specified and as directed upto 5 HP capacity :-
Renovation and Standardization of earth mat and earthing of bay equipment pertaining to 33kV Feeders and 33kV PTR bay equipment at 132/33kV Sub-Station Bapatla under RMI 2024-25 scheme.