Loading…
Loading…
10,338 results • Best match
REPAIRS MAINTENANCE OF CERTAIN ELECTRICAL ITEMS AND INTERNAL ELECTRIFICATION IN ZONE B OTM AND MD ACCN AREA AT INS RAJALI ARAKKONAM
M&L for sub main wiring for phase and neutral with PVC FRLS insulated unsheathed multi stranded along with earth wire FRLS PVC insulted copper conductor, single core cable in and including surface/concealed /PVC conduit appropriate size including cutting chases on brick walls concrete surfaces not exc 10cm girth and making good in cement mortar (1:3) the existing surface after carryiing out the concealed wiring including necessary finishesas specified for the following sizes. Make for Copper cables: Finolex/Polycab / Plaza/ Havells. Make of PVC Conduit: SUDHAKAR/FINOLEX/AVON PLAST.
Construction of Jatindra Kumar HS School at Jirania RD Block area under RD Jirania Division SH Providing Internal Electrification work thereof
Construction of Jatindra Kumar HS School at Jirania RD Block area under RD Jirania Division/ SH: Providing Internal Electrification work thereof (As per PWD SOR: I/ Electrification-2021). (detail estimate available with DNIT)
Electrification work, networking, CCTV system and additional alteration to fire alarm system to proposed digital Library at Kamgar Kalyan Mandal, Pr
As per Schedule 'B' (1 Works)
Installation of 1000KVA (1MVA) Sub Station alongwith HT/LT Line at High Security Prison Dambra Tehsil Mahanpur District Kathua in respect of Sub Division Billawar of Electric Division, JPDCL Kathua on Turnkey Basis.
Earthing of substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm No.minal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI Strip for neutral earthing of size 25 mm x 3 mm for connection of transformer body,G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover.
Work for Erection of Temporary Lines for Electrification of Kanwar Patri and Installation of Generators and their Operation and Maintenance etc. and Dismantling after Completion of Kanwar Yatra under EDC Roorkee
6 Earthing of G.I. Pipe Pole dia 1.5 Inch (Length 18-20 Feet) by M.S. Earthing Rod 20x250 mm Job 374
Construction of Skill Centre at Govt. Degree College at Sopore BWO Electric work
ENVIRONMENTALLY SAFE MAINTENANCE FREE COPPER Rod EARTHING SYSTEM Necessary soil treatment is to be made by the contractor in order to improve the Pit resistance Value .Supplying, Installation and Testing of 75 mm copper Pipe Filled with Crystallineconductive Mixture with Eco friendly GEM Backfill Compound 2No. Bags also having Earth pit chamber (300mm x 300mm) with man- hole cover for the above. Including cost of 2OMM Wide copper strip as required in one run fitted with of brass nut bolt & spring washer from EARTHING ROD up to MAIN Control PANEL through DWC High Density Poly ethylene Pipe having Corrugation complete job