Loading…
Loading…
10,179 results • Best match
Internal electrification for the work Construction of SH 01 Panchayet Bhawan at Bilthai GP and SH 02 Health Sub Centre at Pekucherra under Panisagar RD Block under RD Dharmanagar Division
Internal electrification for the work Construction of SH:01) Panchayet Bhawan at Bilthai GP and SH:02) Health Sub Centre at Pekucherra GP under Panisagar RD Block under RD Dharmanagar Division (1 Complete work)
Providing Internal Electrification LV System, AC System, Fire Alarm System, External Light System, Lift System Facade Light System for the Proposed Special Panchakarma Hub, at M.A Podar Hospital, Worli, Mumbai.
As per Schedule 'B' (1 Works)
CA NO. GE/CHM-45/2026-2027 COMPREHENSIVE MAINTENACE TO INTERNAL ELECTRIFICATION OF OTM ACCN IN CERTAIN MINOR/ MAJOR UNITS IN THE AOR OF AGE B/R-III AT CHANDIMANDIR MIL STN
Earthing complete with galvanized steel earth plate electrode 600mm x 600mm x 6mm buried directly in ground vertically to a depth not less than 2.25 meter below normal ground level (with top edge of earth plate not less than 1.5 meter below ground level) connected to galvanized iron earth lead wire 4mm dia, (main earthing lead ) by means of galvanized bolts, nuts and washers all as shown in electrical plate no 5 of MES Schedule Part-I (1991) with connected to earth test point & to main switch board with & including adequate quantity of charcoal dust and common salt alround earth plate & 15 mm dia GI pipe light grade for earth lead protection pipe for suitable length and GI pipe 20 mm dia light grade for watering pipe with funnel & wire mesh including necessary earth work and PCC (1: 3 : 6) type C-1 for earth pit and 40 mm thick pre-cast RCC cover in 1 : 2 : 4 type B1 with 3 Nos 8 mm dia TMT bars both ways with lift hook made out of 8mm dia bar including dismantling of old eathing set complete all as specified & directed.
SITC of Wall Fan for Lecture Theatres and other Miscellaneous Electric Work for Govt. Medical Collage Sirohi
Maintenance of Civil Work for Office Building and Divide of Electric Load particular floor wise, MC Bhiwani.
Supply and Erection of 200 KW Control LT Panel for divide of building electric load and other work.
SETC of Electricals wiring works at various municipal properties under jurisdiction of West Zone.(THIRD ATTEMPT)