Loading…
Loading…
10,421 results • Best match
Providing and Fixing of LED Light and Decorative Pole from Balicha Tiraha to near Seth Ji ki Kundal Flyover. 2205
... smooth surface inside with HDPE Coupler, Elbow, Tee at required Depth below the ground for laying cable of following Nominal Outer dia. MFR Test report from NABL accrediated is to be submitted.(Excavation... per pre approved by Engineer in charge. For additional technical parameters of products/work, refer Annexure "A" attached with this BSR 50mm Dia
Providing and Fixing of LED Light and Decorative Pole from Jadav Nursery Tiraha to Kaladwas Chouraha. 2204
... smooth surface inside with HDPE Coupler, Elbow, Tee at required Depth below the ground for laying cable of following Nominal Outer dia. MFR Test report from NABL accrediated is to be submitted.(Excavation... pre approved by Engineer in charge. For additional technical parameters of products/ work , refer Annexure "A" attached with this BSR 50mm Dia
CONSTRUCTION OF INDULAL YAGNIK COMMUNITY HALL AFTER DEMOLITION OF OLD HALL BUILDING AT F.P.NO. 192, T.P.S.NO. 12 (ASARVA EXTENSION SOUTH ) IN BAPUNAGAR WARD, NORTH ZONE, AHMEDABAD (RE-INVITE)
Electrical Work
PROVN OF SECURITY RELATED WORK AND ADDN/ALTN TO BUILDING NO P-13 AT AF STN BARWALA UNDER AGE (I) HIGHGROUND CONTENTS SHEET
Lump sum price worked out by contractor for 'INTERNAL ELECTRIFICATION WORKS' as listed in Schedule A Part III
Construction work of training centre at CDFT , Udaipur
... light point/ fan point/ exhaust fan point/ call bell point as per PWD specification for electrical Works with ISI marked 1.5 sq. mm nominal size FR PVC insulated unsheathed flexible copper conductor ...
Constructing 11 kV line from Kallara junction to Kuriapra using CC and UG (CW-4589-202526-58) of Electrical Section Puthoor under Electrical Division Kottarakkara
Excavation of cable trench of appropriate size (normally 1.2 m deep and 0.35m/0.5 m wide for single/double run) in all classes of soil including breaking clods,watering,ramming and sectioning of soil bank etc and backfilling the soil after cable laying and consolidating the soil in layers of 75 cm (excluding laying of cable)