Loading…
Loading…
9,699 results • Best match
Water cooler installation work in Seth Brij Bihari Primary School, Arjunpurwa.
Electrification etc all comp.
Water cooler installation work in Kamlapur Primary School.
Electrification etc all comp.
As per BOQ
Material and labour for dry river washed and screened dry sand for filling in trenches/ ground 8cm thick before laying of cable and 15 cm thock after laying of cable, stretching and testing the cable Note:- Punned thickness shall only be measured and paid.
Work
Laying of control cable of following sizes from C&R panel to CB, JB , MB as per cable schedule with due opening of cable trench and proper cable dressing to complete the job in all respect.
Urgent Repair of Assistant Engineer WRD office building Sub.Dn. First Mandalgarh, District - Bhilwara,
... light point/ fan point/ exhaust fan point/ call bell point as per PWD specification for electrical Works with ISI marked 1.5 sq. mm nominal size FR PVC insulated unsheathedflexiblecopper conductor ...
REPAIR REPLACEMENT TO SECURITY/PERIPHERY LIGHTS AND OTHER CONNECTED WORKS AT AF DETT KARGIL AND AF STATION LEH UNDER GE AF LEH
Material & Labour for Sand cushioning to under ground cable with clean dry sand locally available with layer of sand 8cm thick before laying of cable and 15 cm after laying of cable complete all as specified & directed. Note- For payment purpose punned thickness of 18 cm shall be measured against spread thickness of 23 cm as mentioned in para 19.75 of SSR part-I.