Loading…
Loading…
9,740 results • Best match
Drilling of Borewell and supply of motar pump in Talamakki shedihonda at TP Manki
Supply and delivery at site best indigenous brand new power capacitor as per IS 2834/1986 with latest amendments with KPTCL authorities and erection, electrification and commissioning of the same at t...
Water cooler installation work in Seth Brij Bihari Primary School, Arjunpurwa.
Electrification etc all comp.
Water cooler installation work in Kamlapur Primary School.
Electrification etc all comp.
As per BOQ
Material and labour for dry river washed and screened dry sand for filling in trenches/ ground 8cm thick before laying of cable and 15 cm thock after laying of cable, stretching and testing the cable Note:- Punned thickness shall only be measured and paid.
Work
Laying of control cable of following sizes from C&R panel to CB, JB , MB as per cable schedule with due opening of cable trench and proper cable dressing to complete the job in all respect.
Urgent Repair of Assistant Engineer WRD office building Sub.Dn. First Mandalgarh, District - Bhilwara,
... light point/ fan point/ exhaust fan point/ call bell point as per PWD specification for electrical Works with ISI marked 1.5 sq. mm nominal size FR PVC insulated unsheathedflexiblecopper conductor ...