Loading…
Loading…
9,749 results • Best match
REPAIR/MAINT OF LT UG CABLES, SWITCH GEARS AND CONNECTED WORKS INSIDE SUBSTATIONS AND AT CERTAIN LOCATIONS IN TECH AREA UNDER GE(AF) TECH AREA GWALIOR
Supply, erecting and installation of steel tubular, swaged, pole of overall length 9 meter having maximum tensile strength ...
Work of Construction of Intermediate CWPH at Kotra Baseri laying of Clear Water transmission main From Kotra to Naroli Nadbai via junction 2 at Naroli IPS Nadbai Nagar Ramgarh Kishangarhbas Tijara Jairoli and Bhiwadi based on HAM model under JJM
Construction of Pump house of RCC framed structure as per approved standard GA, structure, electrical drawing, scope of work and technical specification complete work in all respect including electrical works for indoor and outdoor lighting and fans, rain water drainage, sanitary, plumbing, monorail/ ...
Construction of 33KV Bay and associated works at 132KV Bilashipara GSS for providing power to proposed Thermal Power Plant at Chapar
65 x 12mm GI flat Earthing conductor for earthing of indoor L.T and control panels, junction box, Marshalling boxes, cable trenches etc.
Supply and Installation of 2 Nos. of 12 Mtr High Mast systems with 6 x 200W LED Flood Lights at Alappuzha District ,Chengannur LAC under MLAADS 2025-26
ELECTRICAL WORKS
Rerouting feeder from Farm AB to Kinar AB via Doctors Lane under Electrical Section, Aluva West
Fitting one set AB switch on existing DP, giving connection and drawing sufficient length of GI earthing leads to the ground for earthing, excluding provision of earthing.
Work place for Anaesthesia Consultant at M-OT,7th floor RRS Bldg,ACTREC
LED Panel light 2x2 ft. (System lumen efficacy ≥105 120 lm/Watt)Supplying, installation, Testing & Commissioning of Panel light 2x2 ft., of following body material andconstruction... Glare Rating) 19, Flicker free, (flicker should be below 5 %), life time (LED, Driver& electrical circuitry), of minimum 50000 Burning Hours with, 70% of initial Lumen maintained till ...