Loading…
Loading…
9,858 results • Best match
PROVN OF MTR AND S COMPLEX AT AF STATION LEH
... MDT-150 . Brake wheel dia cross travel shall be 100mm breaking forged 6kg/m Model MDT-100 Electric Contactors: shall have SIEMENS / L&T / GE / BCH/Schenider contactors suitable for Crane... Rating: The rating of all Contactors shall be at least 50% higher than the respective electric motor full load current, at the specified duty cycle. Wiring: All the panel wiring should ...
REDEVELOPMENT AND BEAUTIFICATION WORKS OF BHIMTAL LAKE AT BHIMTAL, DISTT. NAINITAL
Electrical Works Supplying and fixing of entrance glow sign board under direction of officer incharge including all labour & complete in all respects as per direction given by engineer incharge.
Bi-ARC for erection of 66KV D/C tower/H-frame lines with ACSR Dog/Panther conductor for providing power supply to new EHV consumers approved under Option-I
12. Any electrical work or electrical connection to equipment for any other work must be carried
Constructing HT ABC from Sneha Nagar DTR to Harijen Colony DTR
Fitting and erecting one HT PSC Single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil (as per standards), drawing sufficient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing).
REDEVELOPMENT and BEAUTIFICATION WORK OF NAUKUCHIATAL LAKE AT NAUKUCHIATAL, DISTRICT NAINITAL
Electrical works Supplying and laying 1.1kV grade Aluminium Armoured XLPE LT cable 4C x 35 sqmm direct in ground including excavation, sand cushioning, protective covering & refilling of trench etc. complete.
REPAIR, MAINTENANCE OF LT PANELS, LT UG CABLES, LT METRING EQUIPMENTS, REROUTING OF LT CABLES AND FAULT DETECTIONS AND CABLE TERMINATION ACCESSORIES, SIGN BOARDS AND CONNECTED WORKS AT AREA NO 1 AND 3 UNDER GE BELGAUM
M&L for Dry & clean river sand cushioning in two layers, first layers of 80mm thick before laying of cable and second layer of 150mm thick after laying of cable, levelled and punned down to a depth of 100mm above the top of the upper-most cable, for cable protection in trenches, complete all as specified and as directed. Note: The punned down thickness shall be measured for payment.