GENERAL MANAGER CONSTRUCTION WING UKPJN HALDWANI
OFFICE OF THE GENERAL MANAGER (KUMAUN), CONSTRUCTION WING, UTTARAKHAND PEYJAL NIGAM, RESIDENTIAL CAMPUS (1ST FLOOR), CALLTAX KATHGODAM, HALDWANI , DISTT.- NAINITAL(263126)
REDEVELOPMENT and BEAUTIFICATION WORK OF NAUKUCHIATAL LAKE AT NAUKUCHIATAL, DISTRICT NAINITAL
2026_MDPEY_97089_1
1601/NIVIDA Haldwani/102 dt 30/06/2026
Open Tender
Civil Works
365 days
NAKUCHIYATAL DISTRICT- NAINITAL
as per tender documents
2 documents required · 2 mandatory
₹11,800
PM CONSTRUCTION UNIT UKPJN HALDWANI
₹27.9 L
GENERAL MANAGER CONSTRUCTION WING UKPJN HALDWANI
1 Jul 2026
1 Jul 2026
22 Jul 2026
1 Jul 2026
21 Jul 2026
8 Jul 2026
2 Jul 2026 - 6 Jul 2026
7 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of Cement Concrete Pavements as per Technical Specification Clause 202.Dismantling of cement concrete pavements by mechanical means using pneumatic tools breaking to pieces not exceeding 0.02 Cum in volume and stock piling at designated locations and disposal of dismantled materials upto a lead of 1000 m, stacking serviceable and unserviceable materials separately | 200.75 | Cum | 2,039 | ₹4,09,329.25 |
| 2 | Excavation in foundation for retaining, breast walls etc, in all types of soils and rocks including all lead, lift and disposal of surplus material as per direction of engineer - in - charge, as per drawing and technical Nspecifications Clause 305.1 of MORD Specifiction | 8,007.98 | Cum | 396.3 | ₹31,73,562.47 |
| 3 | Hand Packed stone filling in back of wallls including cost of all materials, royalty, T&P etc. complete as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications) | 5,124.03 | Cum | 1,033.2 | ₹52,94,147.8 |
| 4 | Compacting original ground supporting subgrade Loosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of Tables 300.1 and 300.2 for subgrade construction as per Technical Specification Clause 303.5.2. | 15,841.99 | cum | 64.4 | ₹10,20,224.16 |
| 5 | Clearing and Grubbing Road Land Clearing and grubbing road land including uprooting wildvegetation, grass, bushes,shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such treescut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal anddisposal of top organic soil not exceeding 150 mm in thickness as per TechnicalSpecification Clause 201.In area of thorny jungle | 1.91 | hec. | 29,666 | ₹56,662.06 |
| 6 | Concrete with cement, coarse sand and 40 mm gauge stone ballast inproportion 1:4:8 in foundations and floors including supply of all material,labour and T&P etc. required for proper completion of the work. as perdrawings and technical specifications Clause 802, 803, 1202 & 1203 | 822.67 | Cum | 4,921.3 | ₹40,48,581.26 |
| 7 | Providing and laying reinforced cement concrete in superstructure as per drawingand technical specifications Clauses 800, 1205.4 and 1205.5 For Design Mix RCC M-20 Height upto 5m | 28.77 | Cum | 7,603.5 | ₹2,18,752.7 |
| 8 | Cement plum Masonry with 40% plum & 60% 1:3:6 cement concrete including supply of all material, labour, T&P etc. required for proper completion of the work. as per drawings and technical specifications Clause 802, 803, 1202 & 1203 of MORD Specifiction: in foundation | 3,625.2 | Cum | 4,022 | ₹1,45,80,554.4 |
| 9 | Stone masonry in cement mortar for superstructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204. Course rubble masonry (1st sort) In 1:4 cement mortar | 6,355.12 | Cum | 5,161.3 | ₹3,28,00,680.86 |
| 10 | Providing PCC M-20 architectural coping on the top of wing wall, return wall etc.complete as per drawing and technical specification Clauses 615, 710 and1204.3.11 | 4,605 | rm. | 438.9 | ₹20,21,134.5 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.33 MB
Tenderdocumetns.pdf
Tender Documents • 5.33 MB
BOQ_114688.xls
BOQ • 0.44 MB
Download all tender documents and submit your bid