Loading…
Loading…
10,190 results • Best match
Site survey including underground utility verification using (GPR & EPL), Engineering, Procurement, Supply, Loading, Transportation, Unloading, Insurance, Delivery at Site, Handling, Storage, Installation, Testing, Commissioning Including ... complete works for ... Ground Cable Network ...
PRE BONDING TAP: For laying on trench after laying cable on trench to provide indication cable route
Site survey including underground utility verification using (GPR & EPL), Engineering, Procurement, Supply, Loading, Transportation, Unloading, Insurance, Delivery at Site, Handling, Storage, Installation, Testing, Commissioning Including ... complete works for ... Ground Cable Network ...
PRE BONDING TAP: For laying on trench after laying cable on trench to provide indication cable route
Site survey including underground utility verification using (GPR & EPL), Engineering, Procurement, Supply, Loading, Transportation, Unloading, Insurance, Delivery at Site, Handling, Storage, Installation, Testing, Commissioning Including ... complete works for ... Ground Cable Network ...
PRE BONDING TAP: For laying on trench after laying cable on trench to provide indication cable route
Site survey including underground utility verification using (GPR & EPL), Engineering, Procurement, Supply, Loading, Transportation, Unloading, Insurance, Delivery at Site, Handling, Storage, Installation, Testing, Commissioning Including ... complete works for ... Ground Cable Network ...
PRE BONDING TAP: For laying on trench after laying cable on trench to provide indication cable route
REPAIR REPLACEMENT AND MAINT SERVICING OF CAPACITY OF HEATING PLANT AND FAN COIL UNIT ALONGWITH ITS CONNECTED ACCESSORIES AND CONTROL PANEL AND MISC ALLIED WORK AND REPAIRREPLACEMENT AND MAINT OF LAUNDARY MACHINES ALONGWITH ITS RELATED EQPT AND CON
Supply & fixing in replacement of high temperature ignition cable / ignition rod / HT cable with adaptor complete all as per existing type of sample & model and size/type etc and suitable using it for operation of CHS/Boiler plant unit system and including making electrical connection of work, complete all as specified and directed.
Development work for underground parking and Azad Park (13,000 sq. m.) at Azad Park, Bundi Municipal Council.
Providing & Fixing of Electrical insulating rubber matts as per PWD specification for electrical Works, ISI marked confirming to IS: 15652 / 2006 with one side anti skid abberation marks and... pre approved by Engineer in-charge. For additional technical parameters of products/ work , refer Annexure "A" attached with this BSR . 3.3 KV, class A 2 mm thick with proof voltage ...