Loading…
Loading…
10,445 results • Best match
sticker for consumer number in various scheme under all sub division of Rander Division and CFC office of Rander Division and if required work to be carried out at other sub division under jurisdiction of Rander division.
Providing spiral type earthing by G.I. NO 8(weight 2kg -5mtr in
PROVN OF GUARD ROOM WITH TOILET FACILITY AND PERIMETER FENCING AT MAIN GATE OF 102 ENGR REGT UNDER GE BHOPAL
Lump sum price worked out by the contractor for INTERNAL ELECTRIFICATION WORKS as listed in Schedule ‘A’ Part-III (Ref prepriced schedule attached seperately)
Supply, Installation, Testing and Commissioning of On-Grid Ground Mounted / Rooftop, 110 KW Solar Power Plants with Automation (SCADA, PLC) at STP , Meherpalli, Bhubaneswar
Supply, installation of chemical earthing with crystalline conducting materials for Back FILL COMPOUND & INSTALLATION OF Maintenance Free Earthing Electrocode with ISI mark G.I. Pipe dia 50mm as Secondary electrode with wall thickness... G.I. Pipe dia 50mm as Secondary electrode with wall thickness of 2.6mm and the primary earthing electrode will be 25mm*6mm hot dipped galvanized strip filled with a highly conductive ...
Supply, Installation, Testing and Commissioning of On-Grid Ground Mounted / Rooftop, 110 KW Solar Power Plants with Automation (SCADA, PLC) at STP , Basuaghai, Bhubaneswar
Supply, installation of chemical earthing with crystalline conducting materials for Back FILL COMPOUND & INSTALLATION OF Maintenance Free Earthing Electrocode with ISI mark G.I. Pipe dia 50mm as Secondary electrode with wall thickness... G.I. Pipe dia 50mm as Secondary electrode with wall thickness of 2.6mm and the primary earthing electrode will be 25mm*6mm hot dipped galvanized strip filled with a highly conductive ...
PROVISION OF 10 x GUARD ROOMS WITH ELEVATED SENTRY POSTS AT Z-GALI UNDER GE 874 EWS
Lump sum price worked out by the contractor for INTERNAL ELECTRIFICATION WORKS carried forward from Pre-Priced Schedule 'A' Part-II.
Tender for Installation and Commissioning of 2 LMO tanks and CMC for 5 years at CSMH
13 kl Liquid oxygen tank and 500 NM3/Hr AV Coil Civil foundation work and installation, 02 Nos site plan approval, required Vessel Dossier documents, Rule 18, Rule 19, required pipeline for liquid tank to AV coil, required valve safety valve ,water tap connection electrification,fencing metal grill, gate and provision of required latest fire safety rule, any other required as per PESO guidelines (With PESO License)