Supply installation and commissioning of one High Mast light inside Biju Pattnaik Park in w. no8 NAC Athgarh
Earth work in excavation of trenches in a l kinds of soil including B. T. Road, ordinary soil, hard... required depth & within initial lead of 50mtrs & 1.5mtrs initial lift etc. complete for laying of cable including cost of a l labour charges, T& P required for the work & as per direction of Engineer in charge. 1 x 40 Mtrs. x 0.30 Mtrs.x 0.30 Mtrs. = 3.6 ...
Supply installation and commissioning of one High Mast light inside Creamatorium near Gadasahi in w no3 NAC Athgarh
Earth work in excavation of trenches in a l kinds of soil including B. T. Road, ordinary soil, hard... required depth & within initial lead of 50mtrs & 1.5mtrs initial lift etc. complete for laying of cable including cost of a l labour charges, T& P required for the work & as per direction of Engineer in charge. 1 x 40 Mtrs. x 0.30 Mtrs.x 0.30 Mtrs. = 3.6 ...
ELECTRICAL
Cat6 UTP, OFC & Power Cable Laying Charges
SPL REPAIR/REPLACEMENT OF HT CABLE FROM 33 KV TO CAVALRY CHOWK IN CANTT AREA AND FROM CAVALRY CHOWK TO 10 NO PUMP HOUSE IN CANTT AREA UNDER GE (I) KANPUR
M&L for sand cushning to U/G cable in layers of 23cm thick (8 Cm before laying the cable and 15 cm thick after laying the cable) in trenches including watering and consolidation, complete all as specified and directed. Note: Only punned thickness 18 cm shall be measured and paid.
Improvement of HT/LT Network in the premises of Police Training School Manigam-Retender
Providing & Laying of Earthing of substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm No.minal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI... No.minal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI Strip for neutral earthing of size 25 mm x 3 mm for connection of transformer body,G.O Set & lightening arrestor ...
46/EDC(Ayodhya)/2026-27
Fabrication and Errection of Single Pole Support on ST/PCC Pole Pole including grouting with 1:4:8 ratio Cement, sand & Brick Ballast& including digging of pit and fixing of all accessories clamp & earthing as per RESPo Norms. (Cost of clamps borne by contractor)