Loading…
Loading…
10,755 results • Best match
REPAIR /REPLACEMENT OF HT OVER HEAD LINES HT UG CABLES GODs AND OTHER CONNECTED WORKS AT LANSDOWNE UNDER AGE(I) LANSDOWNE
Supply and laying cable protection bricks, common burnt clay sub class 'B' designation 75 for protection of UG cable laid in trenches with axis of the bricks perpendicular to the axis of the cable complete all as specified and directed.
Supply and Fixing of Street light and Street light Poles with two year Maintenance in Ward No.10, Zone-1 at Tambaram City Municipal Corporation
Supply and clamping of. U.G. cable: Supply and laying of 4 x 16sq.mm PVC armoured (Aluminium) LT UG cable on wall or post with necessary clamping with necessary arrangements etc complete.
same as above
Supply of Earthing of substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI Strip for neutral earthing of size 25 mm x 3 mm for connection of transformer body,G.O Set & lightening arrestor ...
Replacement of Isolators, AC/DC Distribution Panels, Battery Bank and Battery Charger at Grid Station Bishnah and Jourian and supply and erection of Air Conditioners at Grid Station Jourian
36KV, 50C/S,2500Amp, 31.5KA for one second, motor operated horizontal double break, outdoor type three pole isolator with one earthing switch with copper fixed and moving contacts/copper current carrying parts with galvanized iron mechanism box, SCADA compatible
Work for Construction of Water Treatment Plants CWRs and CWPHs Near WTPs Clear Water transmission main From WTP various IPSs Laying of Rising mains to different ESRs Construction of ESRs Distribution system in villages providing FHTCs Including
Construction of Pump house of RCC framed structure as per approved standard GA, structure, electrical drawing, scope of work and technical specification complete work in all respect including electrical works for indoor and outdoor lighting and fans, rain water drainage, sanitary, plumbing, monorail/ ...
Constructing 11 KV Line with UG Cable 300 sqmm by HDD from Malayattoor Sub Station to Neeleema AB under Electrical Section Malayattoor
Fitting and erecting one HT Double Pole Structure using PSC pole in position including fitting 2 channel cross arms, digging and back filling pit in ordinary soil, drawing sufficient length of GI earthing leads through all cross arms to the ground for earthing (excluding provision of earthing).