El.D.C.No.North/2227/2026/ Supply and Erection of 7 Nos of 9.5 Mtr lamp posts and replacement of damaged cable at G.N.T Road from EthirajSamy Salai Junction to Moolakadai Flyover junction in Div 35, Zone 4
Labour for laying of cable at Bridge portion through 50 mm OD HDPE pipe including carting of cable & carting of HDPE pipe including MS Clamp,saddle with screws and nuts
S&T work in c/w Upgradation/Modernisation of infrastructure at Kaurha, Jwalapur, Chandausi, Roza line no. 05 & 06 and Jangbahadurganj stations goods sheds over Moradabad Division of Northern Railway
... SDO/RDSO./EandB/001 dated:- 19.09.2008 and Drg No. RDSO/SDO/RDSO./EandB/002 dated:- 19.09.2008. Earthing kit consisting of earthing electrode of 17mm dia as 3m long -01 no 2 MEEB (300mmx25mmx6mm) -o1 no. 3. SEEB (150mmx25mmx6mm)... (minimum). This includes:- Provisiion of earth connection from MEEB to SandT equipment i.e. cable sheath, apparatus case, BPAC, Axle counter, IPS, Data Logger etc. with PVC earth wire ...
PROVISION OF STAND BY HT UG CABLE FROM SOLAR POWER PLANT TO MAP IFFA PH-II (MV COLONY) AT OTA AND 160KVA TRANSFORMER AND ALLIED WORKS FOR BARRACK NO 4,5 AND 6 AND SPECIAL REPAIRS/ REPLACEMENT OF HT UG CABLE FROM OTA OUTSIDE POWER HOUSE TO PO COLONY A
... method) including preparing and setting up the plant and equipment, preparing new pipe/cable laying work like excavation shoring/ strutting etc drilling, stringing reaming pulling back the new work on the path alignment proper disposal of drilling fluid and the ground penetrating radar ...
Providing Of 100 KVA Transformer and 4 Poles near Ziarat Sultan Ul Aarifeen at Zagigam Rahmoo Pulwama under UT Capex 2026-27
Earthing of substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI Strip for neutral earthing of size 25 mm x 3 mm for connection of transformer body,G.O Set & lightening arrestor ...
AUGMENTATION/UPGRADATION OF E/M INFRASTRUCTURE AND CONNECTED MISC E/M WORKS IN TECH AREA AT AFS, SULUR
A. Load Break Switch:- (a) Three position load break with dis-connector and earthing Switch, offload (connected in series with VCB) (b) Operating mechanism with two separate shafts for load break switch function and earthing function. (c) Switch position indication for load break switch and earthing switch. (d) ...
Replacement of plastic body wall fan and pedestal fan located at different offices of Main Block, Block III, IV, V, C and D of Writers Buildings.
... and external connections with 1.5 sq.mm FR, PVC insulated copper conductor single core cable and earthing etc. as required. (Make: EPC/Cinni/Orient/Crompton)