Loading…
Loading…
10,910 results • Best match
SPL REPAIR/REPLACEMENT OF LT OH LINES TO UG CABLE WITH ALLIED WORKS AT OFFRS MD ACCN AT NAMS (3rd Call)
M&L for earthing complete with galvanized iron or steel plate electrode 600 mm x 600 mm x 6.00 mm thick... salt in alternate layers and electrode connected to galvanized iron strip 25x4 mm dia as earthing lead by means of GI bolts, nuts, check nuts and washers, earth strip protected by galvanized ...
12/EDC(H)/2026-27
Ordinary earthing by 11 KV MS earth Rod 2500 mm long as per RESPO schedule. All material except earthing rod shall be supplied by the contractor.
Installation of High mast light
Earthing Earthing with 50 mm dia Gl pipe 3.64 mm thick x 3.04 Mts. long with By ISI-Medium GI Pipe as per GS.
Shifting and Conversion of HT Overhead lines to Underground Cable which passing along the proposed construction of Main road from Talawade To Chakan Phase I Industrial Area opposite to Litens Automotive India Private Limited plot no PAP A 3 Chakan M
Supplying, installing and testing earthing with galvanized iron earth plate size 60 x 60 x 0.6 cm with funnel with a wire mesh for watering and brick masonry block C.I. cover complete with all accessories of G.I. materials & recording the results as per specification no. EA-EP
RENOVATION IN HOUSE NO. 547, (TYPE-12) IN SECTOR-7, CHANDIGARH. (E.I. WORK). (IBM NO. W4/2026/26018)
DSR item No.1.8 Wiring for light point/ fan point/ exhaust fan point/ call bell point with 1.5 sq.mm FRLS PVC insulated copper conductor single core cable in surface / recessed medium class PVC conduit, with piano type switch, phenolic laminated sheet, suitable size M.S. box and earthing the point with 1.5 sq.mm.FRLS PVC insulated copper conductor single core cable etc. as required.
Providing Erection and Commissioning of 11/.4 KV 400 KVA DTR and CT/PT Unit with metering equipment for SOP to LWSS in GP Loza Manal and Rast, Stage 1st and 2nd Under ESD Panog in respect of ED Rajgarh for Operation Circle HPSEBL, Nahan
... commissioning of 11/.4 KV CT/PT Unit alongwith Metering equipment : - Digging of pit for pole and earthing (4 Nos for poles and 6Nos for earthing) Drilling of holes in X-arms, preparation of plateform STR with Member C.I.A. i.e. X-arms ...