10,494 results • Best match
COMPLETION OF INCOMPLETE WORK FOR PROVISION OF OTM ACCN and ALLIED FACILITIES AT ALONG UNDER CCE (ARMY) NO 1 DINJAN
Supply, Installation, testing and commissioning of integrated water treatment plant including all mechanical works, electrical control panel, piping works, interconnection works, civil works in foundations and required components with accessories as per details here in after ...
PROVN OF 03 X SINGLE JCO LIVING (SEMI PERMANENT) INCLUDING RWH AT REASI UNDER GE NAGROTA
Supply, laying and testing cable XLPE Insulated ,screened, PVC bedded, galvanized steel strip or wire armoured, electric power cables (heavy duty) 1100 Volts grade with stranded aluminium conductor of size 25 sq mm 3.5 core complete all as specified and directed.
Construction of Man-Made Lake, Rajpipla
Cost of Electrical work @ 5% of cost (D)
Repair/ Renovation of Guest House at Nigeen Club.
Earth work excavation for cable trench, 2 ft deep with an average breadth of 1.5ft and refilling of trench with excavated earth after laying of cable and ramming It properly excluding cost of cable
PROVN OF SUN SHELTER FOR ORP AC AT AF STN NALIYA
Note:- (i) Earthing is to be done infront of the Engr-in-Charge. (ii) Test Results of earthing to be submitted by the contractor for all earthings. (iii) The Contractor shall have to give written guarantee for maintenance earth resistance ...
Augmentation of air conditioning system in rooms of HSVP Office Building sector-3, Rohtak including one year defect liability and maintenance free of cost.
[24.1.1]EARTHING AND LIGHTENING ARRESTOR 1. Earthing with GL earth pipe 4.5 m long and 40 mm dia with masonry enclosures on the top etc. (but without charcoal or coke and salt) as required.