Loading…
Loading…
10,826 results • Best match
Removal of existing compressor in borewell and providing 7.5 HP submersible motor pumpset, Delta starter, UPVC pipes and cables at Sirupooluvapatti Aadhidravidar colony, Sirupooluvapatti and solipalayam in ward no 25
... of submersible pumpset in borewell/openwell including fixing and jointing submersible cable with proper clamps upto the starter to required depth and also fixing of riser pipes... three pilot (indicating) lamps capacitor single phasing preventor, water level guard and laying and jointing the cables and twin earthing as per IE rules etc., complete and testing the pumpset and trail run for 10 days.
Evacuation of Power from 33 11 KV 3.15 MVA Receiving Station Dali-Udyanpur through three number of 11KV Feeders under the jurisdiction Electric Division JPDCL Doda
Earthing Complete by GI Rod 20mm 2.5 mtr long through GI Strip.
SITC of 03 No. 4Way High mast lights at Illahi bagh grid,Rangpora Chowk near Jamia Masjid and Parray Mohalla Rangpora.
Earthing of Octagonal Pole Complete by GI Pipe 40 mm or GI Rod 20mm 3 mtr long through GI Strip (25x3)mm
Running, maintenance and operation for submersible pump sets, sewage submersible pump sets and general lighting at Sector-16A and Running, Maintenance and Operation of Sub. Pump set at Dhobi Ghat, Sec-16B, Dwarka
... F.≥0.95, IP20, CRI >80, Flicker free, (flicker should be below 5 %), life time (LED,Driver & electrical circuitary), of minimum 50000 Burning Hours with , 70% of initial Lumen maintained till... respect i/c connections with 1.5 sq mm FRLS, PVC insulated copper conductor single core cable and earthing etc. as required with Minimum 5 year OEM warranty. System lumen efficacy ≥105 120 lm/Watt ...
As per NIT
Supply and laying of XLPE insulated PVC sheathed Aluminum conductor armoured cable of 1.1 KV grade as per IS 7098 (Part-I) 1988 (amended up to date) of the following sizes to be laid in existing Trench/Ducts/Cable Tray/ RCC/ HUME/ METAL/ DWC pipe / on surface with the help of MS clamps of suitable ...
PREVENTIVE MAINTENANCE OF PUMPS, SUBMERSIBLE PUMPS AND MOTORS OF VARIOUS E/M INSTALLATIONS UNDER AGE E/M-II OF GE 865 EWS
Material and labour for Sand cushioning to underground cables 8 cm below the cable before laying & 15 cm above the cable after laying, complete all as specified in clause 19.75 of SSR Part-I, complete all as specified and/or as directed by Engr-in-Charge. Note : Punned thickness only will be measured and paid for.