Loading…
Loading…
10,689 results • Best match
Providing Sub Main Wiring for connection of solar panel inverter output power to desired load for Tehsildar Office Building, Mayabunder.
Supplying and fixing following way, single pole and neutral, sheet steel, MCB distribution board, 240 V, on surface/ recess, complete with tinned copper bus bar, neutral bus bar, earth bar, din bar, interconnections, powder painted including earthing etc. as required. (But without MCB/RCCB/Isolator)
PROVN OF 02XSTP AT JNE COMPLEX AND 01 NO STP AT OTHER LOCATION UNDER GE (N) UDHAMPUR
... engine coolant temp, low fuel level alarm, start/stop fail, charging alternator fail. (c) Cable entry gland plate without cable glands. Foundation DG Set shall be installed on new foundation block as per manufactures recommendations including excavation works ...
CONSTRUCTION OF INDORE STADIUM AT SHRI BANGAR GOVERNMENT HIGHER SECONDARY SCHOOL, PALI
... FR PVC insulated & unsheathed flexible copper conductor as per PWD specification for electrical Works with ISI marked (IS:694) and as per IS 8130 : 2013 of 1.1 kV grade . Wire should be made... for all testing facilities for wires. For additional technical parameters of product / work refer Annexure 'A' attached with this BSR, 2 x 1.5 sq.mm
Engineering, Procurement and Construction (EPC) Work for Designing and Construction of Barrage, Protection work & other allied activities across River Sabarmati at Village Chhelpura Ta.Satlasana Dist-Mehsana. including Operation and Maintenance for 10 Years.
5.3 On completion of Electrical work 1%
Construction of 1 Classrooms at Govt HighSchool at Jogundabhavi in Shorapur Taluka District Yadgir Under 4202-01-201-1-04-(139) (Education) for the Year 2025-26 (DICE CODE 29330810006)(RESERVED FOR SC)
Electrical work
COMPLETION OF INCOMPLETE WORK OF AUGMENTATION OF GEARING AND SHAFTING FACILITIES AT NSRY, SRI VIJAYA PURAM.
M&L for sand cushioning with dry and clean fine river sand for underground cable 8 cm before laying cable and 15 cm after laying and punned to 18 cm after laying of cable complete all as specified and directed. Note:- Punned thickness shall be considered for payment purpose.