Tender Value
₹350.1 Cr
EMD Value
₹3.5 Cr
Closing Date
13 Jul 2026, 6:00 pm4d left
Executive Engineer, Dharoi Head Works Division No.1, Dharoi Colony
Engineering, Procurement and Construction (EPC) Work for Designing and Construction of Barrage, Protection work & other allied activities across River Sabarmati at Village Chhelpura Ta.Satlasana Dist-Mehsana. including Operation and Maintenance for 10 Years.
311533
01 of 2026-27
Open
Miscellaneous Works
Mehsana
12 documents required · 12 mandatory
₹18,000
Executive Engineer, Dharoi Head Works Dn No.1, Dharoi Colony
₹3.5 Cr
5 Jun 2026
5 Jun 2026
14 Jul 2026
5 Jun 2026
13 Jul 2026
5 Jun 2026
Name of Work: Engineering, Procurement and Construction (EPC) Work for Designing and
Construction of Barrage, Protection work & other allied activities across River
Sabarmati at Village Chhelpura Ta.Satlasana Dist-Mehsana. including Operation
and Maintenance for 10 Years.
Cost put to Tender
BILL OF QUANTITIES
ENCLOSURE- III (VOL-III)
Date of Downloading : Up to Dt. 00-00-2026 to Dt. 00-00-2026, 12:00 Hrs.
Date of Online Submission : Up to Dt. 00-00-2026, 18:00 Hrs.
Date of Submission of Tender Fee,
EMD/Bid Security & Other Documents : Up to Dt. 00-00-2026, 18:00 Hrs.
Date Pre-bid Conference : Dt. 00-00-2026, 14:00 Hrs.
Date of Opening of PQ Bid : Dt. 00-00-2026, 12:00 Hrs. (if possible)
OFFICE OF THE EXECUTIVE ENGINEER
DHAROI HEAD WORKS DIVISION NO-1
CHHELPURA BARRAGE (ENCLOSURE-III) PRICE BID AND PAYMENT SCHEDULE
LIST OF TENDER DOCUMENTS
SR. VOLUME NO. PART DESCRIPTION
Invitation for Bid (IFB)
Section -1 Instructions to Bidders
1. VOLUME - I Section -2 Qualification Information
Section -3 Conditions of Contract
Section -4 Contract Data
Section -5 Technical Specifications-
Civil Works (General)
Section -5 Technical Specifications-
PART-A Civil Works (Particular)
Section -5 Technical Specifications-
2. VOLUME - II Civil Works (Design Requirements)
PART-B Section -5 Technical Specifications-Mechanical
Section -5 Technical Specifications-Electrical
Section -5 Technical Specifications-Operation &
Maintenance Works
- Section -6 Form of Bid
3. VOLUME - III Section -7 Bill of Quantities
(Separately Attached as Enclosure-III)
Section -8 Securities and Other Forms
- Section – 9 Drawings (Typical)
(Separately Attached As Enclosure-II)
Section -10 Documents to Be Furnished by Bidder
Section -11 Project Related Conditions
Enclosure-I Technical Specifications
(Part-A, B, C, D)
ENCLOSURES Enclosure-II Drawings (Typical)
Enclosure-III Bill of Quantities
(Price Bid and Payment Schedule)
CHHELPURA BARRAGE (ENCLOSURE-III) PRICE BID AND PAYMENT SCHEDULE
Instructions and Conditions
Name of Work: Engineering, Procurement and Construction (EPC) Work for
Designing and Construction of Barrage, Protection work & other allied activities
across River Sabarmati at Village Chhelpura Ta.Satlasana Dist-Mehsana.
including Operation and Maintenance for 10 Years.
The project envisages design, approval from owner’s consultant & vetting from
institutions approved by EIC, construction and subsequent Operation and Maintenance
as detailed in the scope of work. For guidance of bidders, outline drawings showing
the general proposed arrangement contemplated by the employer are attached in
Volume-III. However, tender is to be awarded for the Contractor’s own design
complying with the various requirements indicated in the bid documents.
The typical outline drawings enclosed are to be taken as indicative except for certain
salient parameters, obligatory requirements etc. which have been specified in this
section and the chapter on design criteria. These outlines also specify the minimum
acceptable mix, specification and sizes of different components and the Contractor’s
design shall provide for comparable specifications and in any case not inferior to those
for corresponding components. If various items and activities as per scope of work of
the tender document are not found to be included in Contractor’s technical proposal,
drawings and technical note, then the offer quoted by the Contractor shall be
presumed to be inclusive of all such items, specifications and activities as per scope of
work in the tender document. No extra payment shall be paid for the same.
The bidder must quote his offer at the specified space in the PRICE BID both in
words and figures. The price bid should be submitted online only. The offer quoted
shall except in so far as it is otherwise provided under the contract, include all
constructional plants, equipment’s, labour, supervision, all construction materials, all
leads and lifts, erection, maintenance, enabling works, insurance covers, profits,
overheads, royalties and duties together with all general risks, liabilities and
obligations set out or implied in the contract that is required to complete the intents
and purpose of the contract without any additional payment. The quote must be of
excluding GST. Materials to be used in embankments and unserviceable materials to
be disposed should be with all lifts and lead.
In case of any discrepancies between provisions stated in the scope of work and those
covered by the technical specifications / drawings, the decision of EIC is bounded to
The bidders shall quote his offer in Indian Rupees only.
CHHELPURA BARRAGE (ENCLOSURE-III) PRICE BID AND PAYMENT SCHEDULE
Cost of work in
Cost of work in
Description of Work Words
Engineering, Procurement and Construction (EPC)
Work for Designing and Construction of Barrage,
Protection work & other allied activities across River
Sabarmati at Village Chhelpura Ta.Satlasana Dist-
Mehsana. including Operation and Maintenance for
(A) Total Tendered Amount
(B) Rebate on above tendered amount (if any) % (in figure) ……………………………… (in
(C)Net Tendered Amount (A-B) (in figure) ………………………………
1 The Contractor shall exhibit a board with detailed specification and details of work as directed by
the Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per
Govt. G.R. NO.: MIS102010/17/K1 Dated:30/07/2018 as stated in S.O.R. therefore in
R.C.C. items where there is a change as per actual mix design the cost of difference of
cement consumption have been deducted from the rate of original item at the rate of
input rate mentioned in all the tender
The bidder shall quote the lump-sum price (Excluding GST) on online portal for Price Bid (i.e.
the Price Bid - online format).
All rights are reserved with the NWRWS & Kalpsar Department for re-appropriation, regarding
it. However, in case of any discrepancy / difference and any representation from the agency
shall not be entertained.
I/We hereby agree on tender for carrying out the above work as specified in the scope of
work within time specified of therein and in accordance with all specifications, Scope of work,
designs, drawings and instructions in writing referred to in provisions under annexed conditions
of contract under contract documents and agree that all materials of construction in the work are
to be procured by us. Should this tender be accepted, I/We hereby agree to abide by and fulfil all
the terms and provisions of the conditions of contract annexed there to as fully applicable, and
in default thereof, agree to forfeiture of and pay to the client, the sums of Earnest money
mentioned in the said conditions.
Sign, seal and address of the contractor:
CHHELPURA BARRAGE (ENCLOSURE-III) PRICE BID AND PAYMENT SCHEDULE
PAYMENT SCHEDULE
Name of Work: Engineering, Procurement and Construction (EPC) Work for Designing and
Construction of Barrage, Protection work & other allied activities across River Sabarmati at
Village Chhelpura Ta.Satlasana Dist-Mehsana. including Operation and Maintenance for
Description contract value
1 Survey, Investigation, Hydrological studies and Preliminary Design 0.5%
2 Approval of Final Design and Completion of Physical Model Study 0.5%
3.1 Completion of Foundation of Main barrage structure up to river bed
(incl. piers, Abutments, Sidewalls)
3.1.1 20% length completed 3.40%
3.1.2 40% length completed 3.40%
3.1.3 60% length completed 3.40%
3.1.4 80% length completed 3.40%
3.1.5 100% length completed 3.40%
3.2 Completion of Main barrage structure up to crest level (incl. piers,
Abutments, Sidewalls)
3.2.1 20% length completed 2.60%
3.2.2 40% length completed 2.60%
3.2.3 60% length completed 2.60%
3.2.4 80% length completed 2.60%
3.2.5 100% length completed 2.60%
3.3 Completion of Main barrage structure as a whole
3.3.1 20% length completed 2.20%
3.3.2 40% length completed 2.20%
3.3.3 60% length completed 2.20%
3.3.4 80% length completed 2.20%
3.3.5 100% length completed 2.20%
3.4 Completion of D/S apron with cut-off walls up to river bed
3.4.1 20% length completed 3.20%
3.4.2 40% length completed 3.20%
3.4.3 60% length completed 3.20%
3.4.4 80% length completed 3.20%
3.4.5 100% length completed 3.20%
3.5 Completion of U/S apron with cut-off walls up to river bed
3.5.1 20% length completed 0.80%
CHHELPURA BARRAGE (ENCLOSURE-III) PRICE BID AND PAYMENT SCHEDULE
3.5.2 40% length completed 0.80%
3.5.3 60% length completed 0.80%
3.5.4 80% length completed 0.80%
3.5.5 100% length completed 0.80%
3.6 Completion of U/S Protection Work
3.6.1 20% length completed 2.60%
3.6.2 40% length completed 2.60%
3.6.3 60% length completed 2.60%
3.6.4 80% length completed 2.60%
3.6.5 100% length completed 2.60%
3.7 Completion of D/S Protection Work
3.7.1 20% length completed 1.40%
3.7.2 40% length completed 1.40%
3.7.3 60% length completed 1.40%
3.7.4 80% length completed 1.40%
3.7.5 100% length completed 1.40%
3.8 On Completion of Successful O&M for 10 Years* 5%
4 MECHANICAL WORK
4.1 On Procurement of Gates at site of work in good condition 2%
4.2 On Installation of Gates, ERU, CU & other components 1%
4.3 On Commissioning of the gates, fully operational with associated 2%
electrical power supply system and DG sets
5 OTHER ALLIED ACTIVITIES
5.1 On Completion of Building work as a whole 1%
5.2 Upon completion of the approach road, office premises with all 2%
associated/ allied works
5.3 On completion of Electrical work 1%
5.4 On Completion of one monsoon after completion of work 1%
6 OPERATION & MAINTENANCE
6.1 On Successfully Completion of 1st Year 0.20%
6.2 On Successfully Completion of 2nd Year 0.20%
6.3 On Successfully Completion of 3rd Year 0.20%
6.4 On Successfully Completion of 4th Year 0.20%
6.5 On Successfully Completion of 5th Year 0.20%
6.6 On Successfully Completion of 6th Year 0.25%
6.7 On Successfully Completion of 7th Year 0.25%
6.8 On Successfully Completion of 8th Year 0.25%
6.9 On Successfully Completion of 9th Year 0.25%
CHHELPURA BARRAGE (ENCLOSURE-III) PRICE BID AND PAYMENT SCHEDULE
7.0 On Successfully Completion of 10th Year 1%
*Note:- After the Defect Liability Period is successfully completed, the contractor may request
the release of the 5% amount mentioned at Sr. No. 3.8. This amount will be released in equal
yearly instalments during the remaining O&M period, provided the contractor submits a valid
annual Bank Guarantee of the same value.
Above Price break up shows percentage of total contract value to be released.
I/we hereby understand completely that the payment to us will be done as per above stage
wise payment schedule and agreed to above payment schedule and satisfied with the terms
of release of payment and will not demand any additional payment other than this.
Sign, seal and address of the contractor:
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
BG.pdf
1.0 Vol-1 Final DTP CHHELPURA SBD.pdf
2.0 (Vol-II) Part-A- Section-A General CHHELPURA.pdf
3.0 (Vol-II) Part-A- Section-B Particular CHHELPURA.pdf
4.0 (Vol-II) Part-A- Section-C Design CHHELPURA.pdf
5.0 (Vol-II) Part-B- Mechanical Works CHHELPURA.pdf
6.0 (Vol-II) Part-C- Electrical Works CHHELPURA.pdf
7.0 (Vol-II) Part-D- Operation and Maintance CHHELPURA.pdf
8.0 (Vol-IV) Tender Drawing INTRO CHHELPURA.pdf
9.0 ENCLOSURE-III (Vol-III) Price Schedule CHHELPURA.pdf
Nivida 1 of 2026-27.pdf
Corrigendum-1.pdf
CORRIGENDUM
Guide Bank 01 of 02-Model (1).pdf
CORRIGENDUM
GENERAL ARRANGEMENT DRAWING CHHELPURA 03 OF 03 (1).pdf
CORRIGENDUM
GENERAL ARRANGEMENT DRAWING CHHELPURA 02 of 03 (1).pdf
CORRIGENDUM
GENERAL ARRANGEMENT DRAWING CHHELPURA 01 of 03 (1).pdf
CORRIGENDUM
FLANK WALL-01-Model (1).pdf
CORRIGENDUM
15 Guide Bank 02 of 02-Model (1).pdf
CORRIGENDUM
14 Apron Reinforcement Detail-Model (1).pdf
CORRIGENDUM
13 Reinforcement Detail of End Pier-Model (1).pdf
CORRIGENDUM
12_Renforcement detail_Pier.pdf-Model (1).pdf
CORRIGENDUM
11 Raft Reinforcement detail-Model (1).pdf
CORRIGENDUM
Download all tender documents and submit your bid