Loading…
Loading…
66,604 results • Best match
GENERAL-Construction of Smart Village Office at Kannadi-II Village , Palakkad TalukElectrification-General Electrical Work
1.10.3:Wiring for light point/ fan point/ exhaust fan point/ call bell point with 1.5 sq.mm FRLS PVC insulated copper conductor single core cable in surface / recessed medium class PVC conduit, with modular switch, modular plate, suitable GI box and earthing the point with 1.5 sq.mm. FRLS PVC insulated copper conductor single core cable etc as required.Group C
Outsourcing of labour part of different electrical works for year 2026-27 under PSPCL Suburban Division Batala of Circle Gurdaspur.
... Lines on Rail/PCC Poles, Distribution T/Fs, Augmentation/Sagging of ACSR of HT/LT Lines, Cables laying, Guarding, Releasing of T/Well Connections, GSC/ISC Connections, Deloading of Overloaded ...
Construction of Maa Canteen with electrification works with necessary electrical appliances of MAA Canteen at Dakbunglow Campus, at Plot no.-832,Mouza-Dalkhola,JL no.- 20, Khatiyan no.-664/1,at Ward no-8
Earthing with 50 mm. dia. ISI make -Medium gauge G.I. pipe of 3.04 mts. Length x 3.64 mm. thick and 1 x 14 SWG G.I. Hot Dip wire ( 4 Mts long ) with necy. items for earthing works as per PWD. Schedule .[ PWD . P- G-1 / I – 2.a ]
THE CONSTRUCTION OF HEALTH AND WELLNESS CENTER AT VILLAGE KOHARA BLOCK LUDHIANA-2 DISTT LUDHIANA CIVIL AND ELECTRICAL WORK
CONSTRUCTION OF HEALTH AND WELLNESS CENTER AT VILLAGE KOHARA BLOCK LUDHIANA-2 DISTT- LUDHIANA (CIVIL AND ELECTRICAL WORK)
THE CONSTRUCTION OF HEALTH AND WELLNESS CENTER AT VILLAGE BHAIROMUNNA BLOCK LUDHIANA-2 DISTT LUDHIANA CIVIL AND ELECTRICAL WORK
CONSTRUCTION OF HEALTH AND WELLNESS CENTER AT VILLAGE BHAIROMUNNA BLOCK LUDHIANA-2 DISTT- LUDHIANA (CIVIL AND ELECTRICAL WORK)
Repair and Maintenance of Electrical Substation and Cabling Work at Govt. Women Polytechnic College Ajmer
P / L of Double wall corrugated HDPE pipe confirming to IS : 16205 P-24, Stiffness Class 750 N, Externally corrugated and having smooth surface inside with HDPE Coupler, Elbow, Tee at required Depth below the ground for laying cable of following Nominal Outer dia. MFR Test report from NABL accrediated is to be submitted.(Excavation of trench, CC Haunching, Back filling of Earth with compaction is to be Paid Extra).